Testing v1.0¶
The testing was done in three main phases, with the first two progressing in parallel:- The mechanical system was tested as a stand-alone unit.
- The Data Acquisition (DAQ) system was tested as a stand-alone unit.
- The mechanical and DAQ systems were integrated and then tested.