Testing v1.0

The testing was done in three main phases, with the first two progressing in parallel:
  1. The mechanical system was tested as a stand-alone unit.
  2. The Data Acquisition (DAQ) system was tested as a stand-alone unit.
  3. The mechanical and DAQ systems were integrated and then tested.

Mechanical System Testing

DAQ System Testing

Integrated Testing