Version 1/15 - Next ยป - Current version
Jeremy Wright, 01/01/2013 10:14 am


Testing v1.0

The testing was done in three main phases:
  1. The mechanical system was tested as a stand-alone unit.
  2. The Data Acquisition (DAQ) system was tested as a stand-alone unit.
  3. The mechanical and DAQ systems were integrated and then tested.

Mechanical System Testing

DAQ System Testing

Integrated Testing

Drawer_Guide_Fouling.png (635 kB) Jeremy Wright, 01/02/2013 08:32 pm

Also available in: HTML TXT