Testing v1 0
Version 1 (Jeremy Wright, 01/01/2013 10:14 am) → Version 2/15 (Jeremy Wright, 01/01/2013 10:15 am)
h1. Testing v1.0
{{toc}}
The testing was done in three main phases, with the first two progressing in parallel: phases:
# The mechanical system was tested as a stand-alone unit.
# The Data Acquisition (DAQ) system was tested as a stand-alone unit.
# The mechanical and DAQ systems were integrated and then tested.
h2. Mechanical System Testing
h2. DAQ System Testing
h2. Integrated Testing
{{toc}}
The testing was done in three main phases, with the first two progressing in parallel: phases:
# The mechanical system was tested as a stand-alone unit.
# The Data Acquisition (DAQ) system was tested as a stand-alone unit.
# The mechanical and DAQ systems were integrated and then tested.
h2. Mechanical System Testing
h2. DAQ System Testing
h2. Integrated Testing