Testing v1 0

Version 2 (Jeremy Wright, 01/01/2013 10:15 am)

1 1 Jeremy Wright
h1. Testing v1.0
2 1 Jeremy Wright
3 1 Jeremy Wright
{{toc}}
4 1 Jeremy Wright
5 2 Jeremy Wright
The testing was done in three main phases, with the first two progressing in parallel:
6 1 Jeremy Wright
# The mechanical system was tested as a stand-alone unit.
7 1 Jeremy Wright
# The Data Acquisition (DAQ) system was tested as a stand-alone unit.
8 1 Jeremy Wright
# The mechanical and DAQ systems were integrated and then tested.
9 1 Jeremy Wright
10 1 Jeremy Wright
h2. Mechanical System Testing
11 1 Jeremy Wright
12 1 Jeremy Wright
h2. DAQ System Testing
13 1 Jeremy Wright
14 1 Jeremy Wright
h2. Integrated Testing