« Previous - Version 11/49 (diff) - Next » - Current version
Jeremy Wright, 09/20/2012 11:12 pm


Operating Manual v1.0

Hardware Operation

Unpacking After Transport

  1. Check shipping container(s) for:
    1. Test stand
    2. Concrete block
    3. Box of accessories
      1. Launch controller
      2. D motor spacer ring
      3. Motor mount adapters (A, B, and C to D/E size)
      4. Thermocouple attachment tape (high temp)
    4. Computer and USB cable
    5. Motors to test (with igniters and igniter plugs)
    6. Fire extinguisher and maybe a bucket for water

Test Stand Setup

  1. Place concrete block in location where test stand will be operated
  2. Set test stand on concrete block
  3. Create the safety perimeter.
    1. Delineate no stand zone for both proximity and positions
      1. Use length of cord for the igniter (radius of operations)
      2. Exclusion zones exist behind where exhaust escapes (30 degree cone), and in front on each side of the exhaust T (30 degree cone on each side)
  4. Set up the management area for test.
    1. Igniter
      1. Clip the igniter to a part of the test stand and deploy the cable to its full length and place it where the test(s) will be run from
    2. Computer
      1. Set up computer
      2. Boot computer
      3. Run USB cable from computer to test stand
      4. Connect Arduino-based DAQ system to USB cable at test stand
      5. Start the Test Stand App
      6. Ensure DAQ system and Computer are both running and connected

Prepare For Test

  1. Test sensors
    1. Push on thrust sensor and confirm current value slider responds
    2. Put fingers around thermocouple(s) (after ensuring it is not hot) and confirm plot responds
  2. Install motor in test stand
    1. A-C Motors
      1. Attach thermocouple(s)
      2. Insert igniter into motor and cap with igniter plug, making sure to space leads
      3. Install the motor in an adapter
      4. Insert D spacer ring into the motor mount
      5. Insert the motor assembly into the motor mount so a notch from the adapter lines up with the clip on the motor mount so it clicks into place
    2. D Motors
      1. Attach thermocouple(s)
      2. Insert igniter into motor and cap with igniter plug, making sure to space leads
      3. Insert D spacer ring into the motor mount
      4. Insert the motor into the motor mount, pushing it all the way into the the motor mount, note the clip should close
    3. E Motors
      1. Attach thermocouple(s)
      2. Insert igniter into motor and cap with igniter plug, making sure to space leads
      3. Insert the motor into the motor mount, pushing it all the way into the the motor mount, note the clip should close
  3. Double check that the range is actually clear
  4. Set up igniter
    1. Make sure the firing pin is not in place
    2. Connect alligator clips from Launch Controller to the igniter (one to each lead)
      1. At this point the range is hot (ready to fire)

Perform Test (Fire Motor and Take Data)

  1. Hit button to enable recording
  2. Insert firing pin into Launch Controller
  3. Check for continuity by pressing on firing pin (light will turn on)
  4. Count down
  5. Press ignition button (may have to hold it down for a second)
  6. At the end of the firing, remove the firing pin from the Launch Controller

Post Test Duties

  1. Remove motor and prepare for disposal
    1. Wait several minutes before removing the motor to allow it to cool down to a safe handling temperature
    2. Remember to also remove the D space ring if the motor was D size or smaller
    3. Remember to find the igniter (it should still be attached to the alligator clips) so it can be properly disposed
    4. For C size motors and smaller, be sure to recover the motor adapter
    5. Store spent motors away from flammable material during future tests
  2. Check to make sure that data was autosaved to the "data" directory.

Post Operations Duties (After Firing All Motors)

  1. Dispose of motor(s), being careful to observe all state, federal, and local guidelines.
    1. Rinse motors in water to ensure they are completely cooled before disposal
    2. Throw the motors away according the manufacturer’s recommendation
  2. Pack up the accessories
  3. Pack up the computer
  4. Pack up the test stand and block

Note: If performing multiple tests during the same setup, repeat the steps in bold for each test.

Preferences_Location.png (16.5 kB) Jeremy Wright, 09/24/2012 08:01 pm

Arduino_Processing_Preferences.png (31 kB) Jeremy Wright, 09/24/2012 08:10 pm

Shepard_DCS_Overview.png (28.1 kB) Jeremy Wright, 01/16/2013 09:13 pm

Also available in: HTML TXT