Power/Temp Monitor and Control System (EPS/ECLSS) Design Review

After the design is reviewed by the client and peers, issues will be posted here. Once these issues have been addressed, all tasks have been completed, and the parts have arrived, construction will begin.

06FEB2013 Client requested an engineering change to increase the current capacity from 10A to 20, survivable to 30.

Also available in: HTML TXT