Requirements document

Version 19 (Jeremy Wright, 01/19/2013 08:56 pm)

1 19 Jeremy Wright
h1. Shepard Test Stand Requirements Document
2 1 Greg Moran
3 19 Jeremy Wright
{{toc}}
4 2 Greg Moran
5 19 Jeremy Wright
h3. Introduction
6 1 Greg Moran
7 19 Jeremy Wright
This requirements document is currently being discussed on the forums "here":https://opendesignengine.net/boards/4/topics/72.  The requirements list matches up to the Initial Questions in step one of the Systems Engineering process as shown below. Each requirement is labeled with STSR (Shepard Test Stand Requirement), followed by the number of the "initial question":https://opendesignengine.net/projects/shepard-ts/wiki/Initial_Questions_v1_0 that the requirement corresponds to, followed by a dot and then the ID number of the requirement.
8 1 Greg Moran
9 19 Jeremy Wright
* *STSR 1.x* - Why are we making this?
10 19 Jeremy Wright
* *STSR 2.x* - Who is this for?
11 19 Jeremy Wright
* *STSR 3.x* - How will this be used?
12 19 Jeremy Wright
* *STSR 4.x* - What features does it need to have (now)?
13 19 Jeremy Wright
* *STSR 5.x* - What features does it need to have (later)?
14 19 Jeremy Wright
* *STSR 6.x* - What are the legacy requirements?
15 19 Jeremy Wright
* *STSR 7.x* - Who's going to build this?
16 19 Jeremy Wright
* *STSR 8.x* - How many do we want to make?
17 19 Jeremy Wright
* *STSR 9.x* - What is the budget?
18 19 Jeremy Wright
* *STSR 10.x* - What is the timeline?
19 19 Jeremy Wright
* *STSR 11.x* - What waste products will be produced by the manufacture and/or operation of this?
20 1 Greg Moran
21 1 Greg Moran
22 19 Jeremy Wright
h3. Technical Requirements
23 19 Jeremy Wright
24 19 Jeremy Wright
Technical requirements are those requirements which include measurable performance values.  Each technical requirement should be verified through testing to ensure the design meets the requirement.
25 19 Jeremy Wright
26 19 Jeremy Wright
* *STSR 1.1* The STS must accommodate low power, commercially available amateur rocket motors sized A through E.
27 19 Jeremy Wright
* *STSR 1.2* The STS must be mobile enough to enable live demonstrations as part of educational and outreach activities.
28 19 Jeremy Wright
** *STSR 1.2.1* The STS total weight shall be less than 25 lbs. or be able to break into components that weigh no more than 25 lbs each (based on OSHA recommendations).
29 19 Jeremy Wright
** *STSR 1.2.2* The STS must be transportable by 1 person.
30 19 Jeremy Wright
31 19 Jeremy Wright
* *STSR 3.1* The design and operation of the STS shall be conducted in compliance with "The National Association of Rocketry (NAR) Standards & Testing Committee Motor Testing Manual, Version 1.5, Effective Date: July 1, 2011":http://www.nar.org/SandT/docs/ST-MotorTestingManual.pdf, henceforth referred to as the NAR testing manual. 
32 19 Jeremy Wright
* *STSR 3.2* The STS must be useful for the verification of Estes thrust vs time "motor performance data":http://estes.aptinet.com/images/page%2033.pdf and case temperature vs time.
33 19 Jeremy Wright
** *STSR 3.2.1* The STS must be able to record motor thrust vs time of Estes motors and transport that data to a laptop computer.
34 19 Jeremy Wright
** *STSR 3.2.2* The STS must be able to record motor case temperature vs time of Estes motors and transport that data to a laptop computer. 
35 19 Jeremy Wright
36 19 Jeremy Wright
* *STSR 4.1* The STS shall be easily set up and torn down for demonstration purposes.
37 19 Jeremy Wright
** *STSR 4.1.1* unpack and set up time should be less than 45 min.
38 19 Jeremy Wright
** *STSR 4.1.2* clean up and storage time should be less than 90 min.
39 19 Jeremy Wright
* *STSR 4.2* The STS shall be easy to package for shipment to any event at which it will be used meaning the whole test stand system shall fit in the backseat or trunk of a standard 4-door sedan.
40 19 Jeremy Wright
* *STSR 4.4* IAW (In Accordance With) NAR testing manual requirements specified in Section 8.5, the STS shall use a data collection system where the sample rate is "1000 samples per second or greater for motors with a burn time of less than 1 second, and at least 500 samples per second for all other motors" "1":http://www.nar.org/SandT/docs/ST-MotorTestingManual.pdf
41 19 Jeremy Wright
* *STSR 4.5* Load cell requirements
42 19 Jeremy Wright
** *STSR 4.5.1* IAW NAR testing manual requirements specified in Section 8.5, the STS shall use a “load cell calibrated with a NIST traceable weight standard”. "1":http://www.nar.org/SandT/docs/ST-MotorTestingManual.pdf
43 19 Jeremy Wright
** *STSR 4.5.2* IAW NAR testing manual requirements specified in Section 8.5, the STS shall use a data collection system "where the least significant bit (LSB) has a value that is" 0.006 lbs ("less than 0.33% percent of the average thrust of the motor under test"). "1":http://www.nar.org/SandT/docs/ST-MotorTestingManual.pdf
44 19 Jeremy Wright
* *STSR 4.6* Thermocouple requirements
45 19 Jeremy Wright
** *STSR 4.6.1* IAW NAR testing manual requirements specified in Section 8.6, the STS shall use thermocouples with "a low thermal mass, and including the amplifier and readout system still be accurate to 10 degrees C" "1":http://www.nar.org/SandT/docs/ST-MotorTestingManual.pdf
46 19 Jeremy Wright
** *STSR 4.6.2* IAW NAR testing manual requirements specified in Section 8.6, the STS shall use thermocouples with a thermal response of "5 seconds or less" "1":http://www.nar.org/SandT/docs/ST-MotorTestingManual.pdf
47 19 Jeremy Wright
** *STSR 4.6.3* IAW (partial) NAR testing manual requirements specified in Section 8.6, a thermocouple will be attached to the motor under test "where the propellant and nozzle meet". "1":http://www.nar.org/SandT/docs/ST-MotorTestingManual.pdf Full compliance with this requirement has been moved to the future requirements section below.
48 19 Jeremy Wright
* *STSR 4.7* IAW NAR testing manual requirements specified in Section 8.5, the STS shall "store the collected data into a general use data formats [sic], such as a .txt, .csv" "1":http://www.nar.org/SandT/docs/ST-MotorTestingManual.pdf
49 19 Jeremy Wright
* *STSR 4.8* The data collection system must have a threshold (minimum) of 2 ADC (Analog to Digital Converter) channels, with 4 being the objective.
50 19 Jeremy Wright
51 19 Jeremy Wright
* *STSR 6.1* Any desktop computer based control software for the STS should run on all three major PC platforms (MS Windows, Mac OS X, and Linux).
52 19 Jeremy Wright
* *STSR 6.2* The STS must use standard connections to the computer running the control software (for example, USB, Ethernet, or similar connections).
53 19 Jeremy Wright
54 19 Jeremy Wright
h3. Project Requirements
55 19 Jeremy Wright
56 19 Jeremy Wright
Project requirements are the remaining requirements which are not tied to specific performance values.
57 19 Jeremy Wright
58 19 Jeremy Wright
* *STSR 2.1* The STS must be well documented so as to meet the needs of open source spaceflight designers who will design and build future test stands (at Mach 30 and elsewhere).
59 19 Jeremy Wright
* *STSR 2.2* The STS documentation and procedures must be complete enough that Mach 30 operators, students and educators who want to bring rocket engineering into the classroom, and anyone else interested in how rockets are tested can learn how to use it.
60 19 Jeremy Wright
* *STSR 2.3* The STS documentation must cover the engine testing procedure from test stand setup, to running tests, and ending with stowing the test stand.
61 19 Jeremy Wright
62 19 Jeremy Wright
* *STSR 3.4* The STS shall be operated IAW the safety procedures which are outlined in Section 8 of the NAR testing manual.
63 19 Jeremy Wright
64 19 Jeremy Wright
* *STSR 4.3* The STS shall provide a fixed base on which to test model rocket motors.  
65 19 Jeremy Wright
** *STSR 4.3.1* The test stand will remain stationary during motor firings.
66 19 Jeremy Wright
** *STSR 4.3.2* The test stand components will not experience undo vibration during motor firings. 
67 19 Jeremy Wright
68 19 Jeremy Wright
* *STSR 7.1* All STS design documentation must be open and complete enough so that ANYONE, without necessarily a technical education in rocketry, propulsion, or engineering, would be able to build and operate the test stand.
69 19 Jeremy Wright
70 19 Jeremy Wright
* *STSR 8.1* The design of the STS must enable the completion of at least one operational test stand.
71 19 Jeremy Wright
* *STSR 8.2* Whenever and wherever possible, considerations should be made so that the design of this STS can be used as a kit in the future.
72 19 Jeremy Wright
73 19 Jeremy Wright
* *STSR 9.1* The cost of the first operational STS must not exceed $200 excluding "consumables" and tools.
74 19 Jeremy Wright
75 19 Jeremy Wright
* *STSR 10.1* If at all possible, the STS should be completed within 3 months of formal launch as an exercise in agile design.
76 19 Jeremy Wright
77 19 Jeremy Wright
* *STSR 11.1* Disposal of the spent Estes motors should conform to all local, state, and federal guidelines.
78 19 Jeremy Wright
* *STSR 11.2* Electronic waste items, including batteries and circuit boards, must also be disposed of according to all local, state, and federal guidelines.
79 19 Jeremy Wright
* *STSR 11.3* If the frame of the STS is damaged beyond repair during operation, proper disposal/recycling guidelines must be followed for the materials used in its construction.
80 19 Jeremy Wright
* *STSR 11.4* Wherever possible, the STS design should make it as easy as possible to replace components which are consumable or relatively easy to damage.
81 19 Jeremy Wright
82 19 Jeremy Wright
h3. Future V2.0 Requirements
83 19 Jeremy Wright
84 19 Jeremy Wright
These are for reference only so that future features can be accommodated in the current design where practical.
85 19 Jeremy Wright
86 19 Jeremy Wright
Version 2.0:
87 19 Jeremy Wright
* *STSR 5.1* High and low speed video capture of the tests from multiple angles.
88 19 Jeremy Wright
* *STSR 5.2* Integrated ignition system so the test management software can control the entire test.
89 19 Jeremy Wright
* *STSR 5.3* Additional measurements including:
90 19 Jeremy Wright
** *STSR 5.3.1* The STS must meet the second part of the NAR testing manual requirement for casing temperature measurements and have a second thermocouple "3/4 of the way down the motor casing as measured from the nozzle end." "1":http://www.nar.org/SandT/docs/ST-MotorTestingManual.pdf
91 19 Jeremy Wright
** *STSR 5.3.2* The STS must be able to record exhaust temperature vs time of Estes motors and transport that data to a laptop computer.
92 19 Jeremy Wright
* *STSR 5.4* Higher resolution measurements.
93 19 Jeremy Wright
94 19 Jeremy Wright
Beyond Version 2.0 (Accommodation of):
95 19 Jeremy Wright
* *STSR 5.5* High power commercial solid motors.
96 19 Jeremy Wright
* *STSR 5.6* Small hybrid motors (on the thrust scale of high power commercial solid motors).
97 19 Jeremy Wright
* *STSR 5.7* Larger thrust hybrid motors.
98 19 Jeremy Wright
* *STSR 5.8* Small liquid engines.
99 19 Jeremy Wright
* *STSR 5.9* Medium liquid engines.
100 19 Jeremy Wright
* *STSR 5.10* Large liquid engines.
101 19 Jeremy Wright
102 19 Jeremy Wright
h3. Glossary
103 19 Jeremy Wright
104 19 Jeremy Wright
ADC - Analog to Digital Converter
105 19 Jeremy Wright
consumables - Items that are used and then discarded, i.e. rocket motors.
106 19 Jeremy Wright
IAW - In Accordance With
107 19 Jeremy Wright
LSB - Least Significant Bit
108 19 Jeremy Wright
NAR - National Association of Rocketry
109 19 Jeremy Wright
STS - Shepard Test Stand
110 19 Jeremy Wright
STSR - Shepard Test Stand Requirement
111 19 Jeremy Wright
112 19 Jeremy Wright
Gelled: 2012-05-28 "v47":https://opendesignengine.net/projects/shepard-ts/wiki/Requirements_Document_v1_0?version=47