Procurement Manufacture v1 0
Version 4 (Jeremy Wright, 11/05/2012 03:52 pm) → Version 5/24 (Jeremy Wright, 11/05/2012 03:52 pm)
h1. Procurement/Manufacture v1.0
h3. Mechanical System
All of the items in the mechanical system are described on the "wiki":https://opendesignengine.net/projects/shepard-ts/wiki/Detailed_Design_v1_0#Mechanical-System "wiki"https://opendesignengine.net/projects/shepard-ts/wiki/Detailed_Design_v1_0#Mechanical-System , and detailed information can be found in the "BoM (Bill of Material)":http://opendesignengine.net/dmsf_files/18?download= .
* The lumber used to build version 1.0 of the test stand was dimensioned in English units, and could be purchased anywhere.
h3. Data Acquisition (DAQ) System
h3. Mechanical System
All of the items in the mechanical system are described on the "wiki":https://opendesignengine.net/projects/shepard-ts/wiki/Detailed_Design_v1_0#Mechanical-System "wiki"https://opendesignengine.net/projects/shepard-ts/wiki/Detailed_Design_v1_0#Mechanical-System , and detailed information can be found in the "BoM (Bill of Material)":http://opendesignengine.net/dmsf_files/18?download= .
* The lumber used to build version 1.0 of the test stand was dimensioned in English units, and could be purchased anywhere.
h3. Data Acquisition (DAQ) System