Procurement Manufacture v1 0

Version 9 (Jeremy Wright, 11/05/2012 04:01 pm) → Version 10/24 (Jeremy Wright, 11/05/2012 04:08 pm)

h1. Procurement/Manufacture v1.0

h3. Mechanical System

All of the items in the mechanical system are described on the "wiki":https://opendesignengine.net/projects/shepard-ts/wiki/Detailed_Design_v1_0#Mechanical-System , and detailed information including measurements can be found in the "BoM (Bill of Material)":http://opendesignengine.net/dmsf_files/18?download= .

* The lumber used to build version 1.0 of the test stand was standard English unit stock, and could be purchased anywhere including "Lowes":http://www.lowes.com and "Home Depot":http://www.homedepot.com in the U.S.
* The coarse thread drywall screws used as fasteners were standard English unit stock, and could be purchased anywhere including "Lowes":http://www.lowes.com and "Home Depot":http://www.homedepot.com in the U.S.
* The drawer slide used as a linear guide is PN "D80614C-ZP-W":http://www.libertyhardware.com/search/detail/?searchType=retail&ID=D80614C-ZP-W&FIN=ZP from "Liberty Hardware":http://www.libertyhardware.com .


h3. Data Acquisition (DAQ) System