Procurement Manufacture v1 0
Version 8 (Jeremy Wright, 11/05/2012 03:56 pm)
| 1 | 3 | Jeremy Wright | h1. Procurement/Manufacture v1.0 |
|---|---|---|---|
| 2 | 1 | Jeremy Wright | |
| 3 | 1 | Jeremy Wright | h3. Mechanical System |
| 4 | 3 | Jeremy Wright | |
| 5 | 6 | Jeremy Wright | All of the items in the mechanical system are described on the "wiki":https://opendesignengine.net/projects/shepard-ts/wiki/Detailed_Design_v1_0#Mechanical-System , and detailed information including measurements can be found in the "BoM (Bill of Material)":http://opendesignengine.net/dmsf_files/18?download= . |
| 6 | 4 | Jeremy Wright | |
| 7 | 8 | Jeremy Wright | * The lumber used to build version 1.0 of the test stand was standard English unit stock, and could be purchased anywhere including "Lowes":http://www.lowes.com and "Home Depot":http://www.homedepot.com in the U.S. |
| 8 | 1 | Jeremy Wright | |
| 9 | 2 | Jeremy Wright | h3. Data Acquisition (DAQ) System |