Procurement Manufacture v1 0

Version 7 (Jeremy Wright, 11/05/2012 03:56 pm)

1 3 Jeremy Wright
h1. Procurement/Manufacture v1.0
2 1 Jeremy Wright
3 1 Jeremy Wright
h3. Mechanical System
4 3 Jeremy Wright
5 6 Jeremy Wright
All of the items in the mechanical system are described on the "wiki":https://opendesignengine.net/projects/shepard-ts/wiki/Detailed_Design_v1_0#Mechanical-System , and detailed information including measurements can be found in the "BoM (Bill of Material)":http://opendesignengine.net/dmsf_files/18?download= .
6 4 Jeremy Wright
7 7 Jeremy Wright
* The lumber used to build version 1.0 of the test stand was standard English unit stock, and could be purchased anywhere including "Lowes":lowes.com and "Home Depot":homedepot.com in the U.S.
8 1 Jeremy Wright
9 2 Jeremy Wright
h3. Data Acquisition (DAQ) System