3 | 1 | Jeremy Wright | h3. Mechanical System |
4 | 3 | Jeremy Wright | |
5 | 6 | Jeremy Wright | All of the items in the mechanical system are described on the "wiki":https://opendesignengine.net/projects/shepard-ts/wiki/Detailed_Design_v1_0#Mechanical-System , and detailed information including measurements can be found in the "BoM (Bill of Material)":http://opendesignengine.net/dmsf_files/18?download= . |
6 | 4 | Jeremy Wright | |
7 | 3 | Jeremy Wright | * The lumber used to build version 1.0 of the test stand was dimensioned in English units, and could be purchased anywhere. |