Assembly Instructions v1 0

Version 21 (J. Simmons, 02/02/2013 03:57 pm)

1 1 Jeremy Wright
h1. Assembly Instructions v1.0
2 1 Jeremy Wright
3 1 Jeremy Wright
{{toc}}
4 1 Jeremy Wright
5 1 Jeremy Wright
h3. Mechanical System
6 1 Jeremy Wright
7 2 J. Simmons
The assembly of the Mechanical System consists of four main sub-assemblies (shown in Figure 1 below):
8 6 J. Simmons
# The motor mount (a modified "*Estes D & E Engine Mount Kit*":http://www.estesrockets.com/rockets/accessories/engine-mounting/303159-d-and-e-engine-mount-kit)
9 2 J. Simmons
# The motor mount bracket
10 2 J. Simmons
# The main structure
11 2 J. Simmons
# The back plate
12 2 J. Simmons
13 2 J. Simmons
*Figure 1 - Shepard Mechanical Components*
14 2 J. Simmons
!shepard_components.png!
15 2 J. Simmons
16 5 J. Simmons
h5. Notes
17 1 Jeremy Wright
18 5 J. Simmons
* Be sure to cut out the parts listed in CutList tab of the [[Bill of Materials|BOM]]
19 19 J. Simmons
* The assembly process for the Mechanical System requires the ues of two different glues
20 20 J. Simmons
** Wood Glue: "Titebond II Premium Wood Glue":http://www.titebond.com/product.aspx?id=2ef3e95d-48d2-43bc-8e1b-217a38930fa2 - This glue forms tight bonds and dries very quickly.  It should be used for all assembly steps except initial fin placement.  It is particularly well suited to making fillets.  Note, transfer this glue to small squeeze bottle for improved application.
21 19 J. Simmons
** Multi-Surface Glue: "Loctite Go2 Glue":http://www.loctiteproducts.com/p/pg_go2_glue/overview/Go2-Glue.htm - This glue bonds to a variety of surfaces including metal, used to attach the copper t-connector to the card board Motor Mount 
22 5 J. Simmons
23 2 J. Simmons
h4. Motor Mount
24 1 Jeremy Wright
25 3 J. Simmons
Assembly of the motor mount follows the instructions supplied with the *Estes D & E Engine Mount Kit* with a few small exceptions which are required to accomodate the t-connector (MM06) used to vent the ejection charge)
26 3 J. Simmons
27 3 J. Simmons
# Take the mount tube (MM01) and mark one end as the front [where the motor will be inserted] and the other as the rear [where the t-connector (MM06) will be attached]
28 3 J. Simmons
# Test fit the t-connector (MM06) in the mount tube (MM01) by inserting it approximately 1/4" into the mount tube (MM01) and then remove it; the fit will be tight, and may even require a slight stretching of the mount tube (MM01)
29 3 J. Simmons
# Make a mark 1/4" from one end of the red engine block (MM04)
30 3 J. Simmons
# Cut the red engine block (MM04) at the 1/4" line from the previous step, keeping the larger section as the final engine block (see Figure 2)
31 3 J. Simmons
 *Figure 2 - Modified Engine Block (top) vs Original Engine Block (bottom)*
32 3 J. Simmons
!modified_engine_block.jpg!
33 4 J. Simmons
# Follow Step 1 in the *Estes D & E Engine Mount Kit* instructions
34 4 J. Simmons
## Step 1.A - Make a mark on the mount tube (MM01) 1" from the rear and 5/8" from the front [this second mark should be offset along the circumference of the mount tube (MM01) slightly]
35 4 J. Simmons
## Step 1.B - Cut a 1/8" wide slit at the mark 1" from the rear of the mount tube (MM01); insert the engine hook (MM05) into the slit (see Figure 3)
36 4 J. Simmons
 *Figure 3 - Engine hook inserted into mount tube*
37 1 Jeremy Wright
!motor_mount_step1b.jpg!
38 8 J. Simmons
## Step 1.C - Apply wood glue to the outside of engine block (MM06) and the inside of the inside of the rear section of the mount tube (MM01) making sure to completely coat the inside of the mount tube (MM01) up to where the engine hook (MM05) is inserted; Slide the engine block (MM06) into the rear of the mount tube (MM01) until it rests agains the engine hook (MM05); be sure to smooth any excess glue in the mount tube (MM01) to create a smooth water tight surface (see Figure 4)
39 5 J. Simmons
 *Figure 4 - Engine block inserted into mount tube*
40 5 J. Simmons
!motor_mount_step1c.jpg!
41 8 J. Simmons
# Follow Step 2 in the *Estes D & E Engine Mount Kit* instructions - Apply a bead of wood glue around the mount tube (MM01) just to the rear of the mark 5/8" from the front and then slide the engine retainer ring (MM02) onto the the mount tube (MM01) from the front of the mount tube (MM01) until the engine retainer ring (MM02) is just past the 5/8" mark (see Figure 5)
42 8 J. Simmons
 *Figure 5 - Engine retainer ring mounted*
43 1 Jeremy Wright
!motor_mount_step2.jpg! 
44 1 Jeremy Wright
# Allow the assembly to dry overnight
45 8 J. Simmons
# Apply a bead of multi-surface glue to the edge of the  base end of the t-connector (MM06)
46 8 J. Simmons
# Insert the t-connector (MM06) into the rear of the mount tube (MM01) (see Figure 6)
47 8 J. Simmons
 *Figure 6 - Completed motor mount*
48 8 J. Simmons
!motor_mount_completed.jpg!  
49 9 J. Simmons
# Allow the motor mount to dry over night
50 2 J. Simmons
51 2 J. Simmons
h4. Motor Mount Bracket
52 2 J. Simmons
53 10 J. Simmons
# Prepare the plate (MMB01)
54 21 J. Simmons
## Drill the four 1/4" through holes for the zip ties (MMB04) (see Figure 7)
55 21 J. Simmons
*Figure 7 - MMB01 with zip tie holes highlighted*
56 21 J. Simmons
!MMB01_zip_ties.png!  
57 21 J. Simmons
## Drill and countersink the two 1/4" through holes for the machine screws (see Figure 8)
58 21 J. Simmons
*Figure 8 - MMB01 with machine screw holes highlighted*
59 21 J. Simmons
!MMB01_machine_screws.png!  
60 21 J. Simmons
## Create the two <insert width here> dados on the bottom of the plate (MMB01) to provide space for the zip ties (MMB04); this can be done on a table saw with either a dado blade or with multiple passes using a standard 1/8" wide blade (see Figure 9)
61 11 J. Simmons
# Clamp the block (MMB02) to the rear edge of the plate (MMB01) (see Figure 10)
62 11 J. Simmons
 *Figure 10 - Block clamped to plate*
63 11 J. Simmons
!motor_mount_bracket_clamped.jpg! 
64 11 J. Simmons
# Drill pilot holes for the two 1-1/2" drywall screws
65 11 J. Simmons
# Attach the block (MMB02) to the plate (MMB01) using two 1-1/2" drywall screws, making sure to leave approximately 1/8" of the rear screw exposed (see Figure 11 - need pic from CAD model)
66 2 J. Simmons
67 12 J. Simmons
<insert pic of final motor mount bracket from CAD model here>
68 12 J. Simmons
69 2 J. Simmons
h4. Main Structure
70 2 J. Simmons
71 13 J. Simmons
<will need images for most of these steps>
72 13 J. Simmons
73 13 J. Simmons
# Assemble the Test Stand Base; Note: it is significantly easier to assemble the Test Stand Base using the concrete block (need part number) as a stand/jig
74 13 J. Simmons
## Place the top (TSBa02) on the concrete block so that the rear edge is flush with the concrete block
75 13 J. Simmons
## Place the two sides (TSBa01) along the edge of the concrete block so the front edges of the sides (TSBa01) are flush with the front of the top (TSBA02)
76 13 J. Simmons
## Clamp the sides (TSBa01) to the top (TSBa02)
77 13 J. Simmons
## Drill pilot holes through the sides (TSBa01) into the top (TSBa02) [3 on each side], and use 2-1/2" dry wall screws (TSBa04) to attach the sides (TSBa01) to the top (TSBa02); be sure to remove the clamps
78 13 J. Simmons
## place the front (TSBa03) under the top so it rests against the concrete block
79 13 J. Simmons
## Drill pilot holes through the sides (TSBa01) and the top (TSBa02) into the front (TSBa03), and use 2-1/2" dry wall screws (TSBa04) to attach the front (TSBa03)
80 14 J. Simmons
# Attach the Test Section Beam
81 14 J. Simmons
## Remove the Test Stand Base from the concrete block
82 14 J. Simmons
## Draw a line down the centerline of the long axis of the top (TSBa02)
83 14 J. Simmons
## Place and clamp the beam (TSBe01) along the line on the top (TSBa02)
84 14 J. Simmons
## Turn the Test Stand Base on its side and drill 3 pilot holes through the top (TSBa02) and into the beam (TSBe01), and use the 2-1/2" dry wall screws (TSBe02) to attach the beam (TSBe01) to the top (TSBa02); be sure to remove the clamps
85 14 J. Simmons
# Prepare the Back Plate
86 15 J. Simmons
## Drill the <insert diameter> pass-through hole in the back plate (BP01)
87 15 J. Simmons
## Place the Test Stand Base back on the concrete block
88 15 J. Simmons
## Place the back plate (BP01) against the back of the Test Stand Base [it should fit between the sides and rest against the concrete block and the beam]
89 15 J. Simmons
## Drill 2 pilot holes through each side (TSBa01) into the back plate (BP01)
90 15 J. Simmons
## Drill 1 pilot hole through the back plate (BP01) into the beam (TSBe01)
91 15 J. Simmons
# Treat the test stand components with heat resistant paint
92 16 J. Simmons
## In a well ventilated area, lay out all of the wooden components and apply two coats of heat resistent primer (see Figure ?)
93 16 J. Simmons
 *Figure ? - Priming Shepard components*
94 16 J. Simmons
!shepard_priming.jpg! 
95 16 J. Simmons
## Allow primer to dry per manufacture's instructions
96 16 J. Simmons
## Apply two coats of heat resistent paint (see Figure ?)
97 16 J. Simmons
 *Figure ? - Painting Shepard components*
98 16 J. Simmons
!shepard_painting.jpg! 
99 16 J. Simmons
## Allow paint to dry per manufacturer's instructions
100 2 J. Simmons
101 2 J. Simmons
h4. Final Assembly
102 2 J. Simmons
103 17 J. Simmons
# Insert the two zip ties (MMB04) into the Motor Mount Bracket (see Figure ?)
104 17 J. Simmons
 *Figure ? - Zip tie placement*
105 17 J. Simmons
!final_assembly_step1.jpg! 
106 17 J. Simmons
# Use the metal screws (MMB03) to attach the Motor Mount Bracket to the end of the drawer slide (RS01) (see Figure ?)
107 18 J. Simmons
 *Figure ? - Motor Mount Bracket attached to Drawer Slide*
108 17 J. Simmons
!final_assembly_step2.jpg! 
109 17 J. Simmons
# Attach the drawer slide (RS01) to the beam (TSBe01) using 1-1/2" drywall screws (RS02) (see Figure ?)
110 18 J. Simmons
 *Figure ? - Drawer Slide attached to Beam*
111 1 Jeremy Wright
!final_assembly_step3.jpg! 
112 18 J. Simmons
# Place Motor Mount on Motor Mount Bracket and close the zip ties (MMB04) snuggly; note, be sure to have a motor in the motor mount to prevent the zip ties from crushing the Motor Mount (see Figure ?)
113 18 J. Simmons
 *Figure ? - Attaching the Motor Mount*
114 18 J. Simmons
!final_assembly_step4.jpg!
115 18 J. Simmons
#  Trim the excess portion of the zip ties (MMB04) (see Figure ?)
116 18 J. Simmons
 *Figure ? - Trimming zip ties*
117 18 J. Simmons
!final_assembly_step5.jpg! 
118 18 J. Simmons
# Place the Back Plate in position and attach it to the Test Stand Base with 2-1/2" drywall screws (BP03) (see Figure ?)
119 18 J. Simmons
 *Figure ? - Attaching the Back Plate*
120 18 J. Simmons
!final_assembly_step6.jpg! 
121 18 J. Simmons
# Attach the 1-1/2" dry wall screw (BP04) to the Back Plate just above the through hole leaving approximately 1/2" exposed; this screw is used to hang the small pulley (BP02)
122 18 J. Simmons
123 18 J. Simmons
This completes the Mechanical System assembly process.
124 2 J. Simmons
125 1 Jeremy Wright
h3. Data Acquisition (DAQ) System
126 1 Jeremy Wright
127 1 Jeremy Wright
The assembly of the DAQ system consists of three main sub-assemblies:
128 1 Jeremy Wright
# MAX31855 Thermocouple Amplifier Breakout Board
129 1 Jeremy Wright
# Force Sensing Resistor (FSR) cable system
130 1 Jeremy Wright
# Arduino ProtoShield
131 1 Jeremy Wright
132 1 Jeremy Wright
h4. MAX31855 Thermocouple Amplifier Breakout Board
133 1 Jeremy Wright
134 1 Jeremy Wright
* The only assembly required for the MAX31855 breakout board is to solder the header pins and terminal block onto the board. Once this is done the breakout board can be soldered to the Arduino Protoshield.
135 1 Jeremy Wright
136 1 Jeremy Wright
h4. Force Sensing Resistor (FSR) cable system
137 1 Jeremy Wright
138 1 Jeremy Wright
* The FSR came with male pins, which complicated assembly somewhat. It would be simpler to buy the version of the FSR with a female connector and make your cable fit that configuration. As it was, female D-SUB connectors that were on hand were used to connect the FSR to the CAT 5e cable that was used between the FSR and the ProtoShield. The pins were crimped on to two of the leads of the CAT 5e cable so that the female ends could receive the male pins of the FSR. The reason crimping was used instead of soldering for the pins is that it's very easy to melt the FSR's substrate, thus making the FSR useless, or at least severely altering its operation.
139 1 Jeremy Wright
140 1 Jeremy Wright
h4. Arduino ProtoShield
141 1 Jeremy Wright
142 1 Jeremy Wright
Components were soldered onto the ProtoShield in the configuration shown in the images below. Note that in the bottom view, the ProtoShield has been flipped vertically towards the bottom of the picture. This allows you to orient yourself so that you can follow the traces. For higher resolution images to aid in assembly, check the Shepard_v1.0_DAQ_Assembly_Images.zip file "here":https://opendesignengine.net/dmsf/shepard-ts?folder_id=24
143 1 Jeremy Wright
144 1 Jeremy Wright
*Figure 1 - Top View of the ProtoShield*
145 1 Jeremy Wright
!ProtoShield_Top_View_Assembly_Edited.png!
146 1 Jeremy Wright
147 1 Jeremy Wright
# The MAX 31855 breakout board has the correct header pin spacing to fit the holes on the ProtoShield, so it was inserted directly. Note that the capacitor that is included with the K type thermocouple when purchased is being used. The thermocouple's reading had too much noise in it otherwise.
148 1 Jeremy Wright
# The red and green wires used were "breadboard prototyping jumpers":http://www.radioshack.com/product/index.jsp?productId=2103801 from Radio Shack. Left over Ethernet cable wires can be used as well.
149 1 Jeremy Wright
# The resistor was soldered directly to the ProtoShield, but care should be taken that the leads of the resistor do not short any of the connections on the board.
150 1 Jeremy Wright
# A 14 pin DIP socket was used for the TLV2374 for multiple reasons including prevention of overheating of the IC during soldering, and ease of replacement in the event of damage due to a wiring mistake.
151 1 Jeremy Wright
# A smaller screw terminal block for the FSR leads (left side) would have ideal, but the larger block pictured was all that was available at the time of assembly. The pins are spaced more widely on the block and thus the positioning was dictated by the spacing of the holes on the ProtoShield.
152 1 Jeremy Wright
# Notice that even though the two green jumper wires disappear under the MAX 31855 breakout board in the image, they have been labeled with what pins they go from/to.
153 1 Jeremy Wright
154 1 Jeremy Wright
*Figure 2 - Bottom View of the ProtoShield*
155 1 Jeremy Wright
!DAQ_Shield_Bottom_View.JPG!
156 1 Jeremy Wright
157 1 Jeremy Wright
# If you view the high resolution version of this image from the Shepard_v1.0_DAQ_Assembly_Images.zip file "here":https://opendesignengine.net/dmsf/shepard-ts?folder_id=24 , you'll notice that several solder bridges have been made to connect different points. Use the schematic diagram found in the Shepard_v1.0_DAQ.zip file "here":https://opendesignengine.net/dmsf/shepard-ts?folder_id=17 to give you a more complete view of what's being bridged.
158 1 Jeremy Wright
# The solder bridges are made by laying short lengths of stripped solid wire against the pins (or in the holes) and then soldering them.
159 1 Jeremy Wright
# Figure 3 labels what the corresponding top side connections are for most of the solder joints.
160 1 Jeremy Wright
161 1 Jeremy Wright
*Figure 3 - Bottom View of ProtoShield With Landmark Connections*
162 1 Jeremy Wright
!Edited_Bottom_View_Assembly_Image.png!
163 1 Jeremy Wright
164 1 Jeremy Wright
# The solder positions where the green and white/green wires are coming off the board is the location of the Force Sensing Resistor (FSR) screw terminal.