Testing
Version 1 (J. Simmons, 10/28/2013 02:55 pm)
| 1 | 1 | J. Simmons | h1. Testing |
|---|---|---|---|
| 2 | 1 | J. Simmons | |
| 3 | 1 | J. Simmons | This document contains procedures and rationale for both prototype testing and QA testing. The prototype tests are designed to ensure the design meets with the specified [[Requirements Document|requirements]]. The QA tests are designed to ensure kits meet quality requirements before being shipped to a customer. |
| 4 | 1 | J. Simmons | |
| 5 | 1 | J. Simmons | {{toc}} |
| 6 | 1 | J. Simmons | |
| 7 | 1 | J. Simmons | h2. Prototype Tests |
| 8 | 1 | J. Simmons | |
| 9 | 1 | J. Simmons | Prototype tests cover the full range of ground station functions. This includes satellite tracking, signal acquisition, "space tweet" decoding. Additionally, the assembly process will be tested in later prototypes. |
| 10 | 1 | J. Simmons | |
| 11 | 1 | J. Simmons | h3. Prototype 1 Tests |
| 12 | 1 | J. Simmons | |
| 13 | 1 | J. Simmons | ... |
| 14 | 1 | J. Simmons | |
| 15 | 1 | J. Simmons | h3. Prototype 2 Tests |
| 16 | 1 | J. Simmons | |
| 17 | 1 | J. Simmons | ... |
| 18 | 1 | J. Simmons | |
| 19 | 1 | J. Simmons | h3. Prototype 3 Tests |
| 20 | 1 | J. Simmons | |
| 21 | 1 | J. Simmons | h2. QA Tests |
| 22 | 1 | J. Simmons | |
| 23 | 1 | J. Simmons | tbd |