Test 112 Instructions

Version 45 (Aaron Harper, 06/05/2014 12:00 am)

1 1 J. Simmons
h1. Test 1.1.2 Instructions
2 1 J. Simmons
3 1 J. Simmons
{{toc}}
4 1 J. Simmons
5 2 J. Simmons
h2. Test Hardware
6 2 J. Simmons
7 41 Aaron Harper
* "Ground Sphere Test Rig":https://opendesignengine.net/projects/groundsphere-test-rig
8 24 Aaron Harper
* Computer, min system reqs: Windows 7, 1GHz, 1GB RAM
9 2 J. Simmons
10 1 J. Simmons
h2. Test 1: Lab Test
11 1 J. Simmons
12 10 Greg Moran
Lab test using low power transmitter at 915 MHz to confirm signal reception and system gain (not an AX.25 signal, but close enough).  These instructions assume that the receiver is already assembled and most recent software is installed.  If not, accomplish the next 2 steps.
13 1 J. Simmons
# Follow the instruction for "GroundSphere Kit assembly"
14 1 J. Simmons
# Follow the instructions for Operations Manual - "Getting Started and Set up"
15 1 J. Simmons
16 8 Greg Moran
17 45 Aaron Harper
Test Date: 04JUN14@2057-2146MST   Test Location: MSL / Issyroo Lab, Walsenburg, CO
18 6 Greg Moran
19 45 Aaron Harper
Record Test Conditions: 23C ambient, indoor test, metal fixtures to hold test gear, moderately noisy RF environment, Cell phones off and batteries removed.
20 6 Greg Moran
21 11 Greg Moran
*Additional Tools Needed:*
22 6 Greg Moran
Tape Measure
23 6 Greg Moran
24 1 J. Simmons
*Safety concerns:*
25 45 Aaron Harper
Standard lab safety; standard procedures reviewed. 
26 1 J. Simmons
27 6 Greg Moran
*Outcome*
28 6 Greg Moran
* Partial verification of technical requirement 1.1.2, 
29 6 Greg Moran
* Confirmation of Ground Sphere performance in best case laboratory conditions
30 6 Greg Moran
* Confirmation of Ground Sphere performance in simulated orbital conditions
31 1 J. Simmons
32 1 J. Simmons
*Instructions:*
33 45 Aaron Harper
# [X] Turn on computer
34 45 Aaron Harper
# [X] Turn on the transmitter
35 45 Aaron Harper
# [X] Plug the GroundSphere USB data connector into an open USB port
36 45 Aaron Harper
# [X] Plug the GroundSphere power cord into a standard 120v power outlet
37 45 Aaron Harper
# [X] Measure and record the distance between transmitter and receiver: 1 meter *Used standard tape measure at 36 inches*
38 45 Aaron Harper
# [X] Launch the SeeDeR version 0.1 software *Used SDR# for the ability to freeze the display*
39 45 Aaron Harper
# [X] Tune the SeeDeR version 0.1 software to receive 915 MHz
40 45 Aaron Harper
# [X] Position the cursor (red vertical bar) at 915 MHz on the horizontal axis
41 45 Aaron Harper
# [X] Record the noise floor signal level: *-53.89 dBm*
42 45 Aaron Harper
# [X] Tune the transmitter to 915 MHz.  "Instructions":https://opendesignengine.net/projects/groundsphere-test-rig/wiki/Operating_Manual
43 45 Aaron Harper
# [X] Set transmitter power to -20dBm. "Instructions":https://opendesignengine.net/projects/groundsphere-test-rig/wiki/Operating_Manual _NOTE: (This is a reasonably strong terrestrial signal, and is an unrealistically high power to expect from SkyCube.  See Lab Test Link Budget figures "here":https://docs.google.com/spreadsheet/ccc?key=0Aptu2_0_mvfAdDBzUHBkaTBKOWMzYVVhT0pxSTlhNEE&usp=sharing)_
44 45 Aaron Harper
# [X] Observe and capture/record the transmitted signal received by GroundSphere.  *Set to -18dBm as closest equivalent*
45 45 Aaron Harper
# [X] Position the cursor (red vertical bar) at the center peak of the displayed radio signal on the horizontal axis
46 45 Aaron Harper
# [X] The signal should be plainly obvious as a strong peak above the noise floor.  If this is not the case, abort the test and troubleshoot. Signal was measured at -11.91dBm, 41.98dBm above the noise floor
47 45 Aaron Harper
# [X] Measure and move the transmitter 3 meters from the GroundSphere antenna ensuring a clear line of sight.
48 45 Aaron Harper
# [X] Set the transmitter power level to -60dBm.  _NOTE: (at this power level, the intent is to get as close as possible to the signal strength that we expect to receive form SkyCube as it flies directly overhead of the antenna, given its orbital parameters.  See the "link budget":https://docs.google.com/spreadsheet/ccc?key=0Aptu2_0_mvfAdHhfU2JMSFdhamYtVTRHcmRpTXEzRmc&usp=sharing  )_
49 45 Aaron Harper
# [X] Observe the transmitted signal received by GroundSphere
50 45 Aaron Harper
# [X] Position the cursor (red vertical bar) at the center peak of the displayed radio signal on the horizontal axis
51 45 Aaron Harper
# [X] Record the radio signal level: *-33.88 dBm*
52 45 Aaron Harper
# [X] Subtract the noise floor figure recorded earlier from the radio signal level recorded in the step above.
53 45 Aaron Harper
# [X] Record the difference between the signals: *20.01 dB*
54 45 Aaron Harper
# [X] The difference between the signal and noise floor should be at least 17dBm.  If this is not the case, abort the test and troubleshoot.   
55 1 J. Simmons
56 45 Aaron Harper
NOTE:  All tests have been completed 3 times with result variances below 0.01%.  Screenshots and pictures are included below, and the raw I and Q dataset is available on the shared project Google Drive Folder.  Warning: it is over 220MB in size and only works with an SDR program like SDR# or SeeDeR.  The audio file is linked below as well. 
57 1 J. Simmons
58 45 Aaron Harper
!http://opendesignengine.net/dmsf_files/450?download=!
59 45 Aaron Harper
One meter test setup (Step 5)
60 45 Aaron Harper
61 45 Aaron Harper
!http://opendesignengine.net/dmsf_files/447?download=!
62 45 Aaron Harper
Noise floor measurement (Step 9)
63 45 Aaron Harper
64 45 Aaron Harper
!http://opendesignengine.net/dmsf_files/446?download=!
65 45 Aaron Harper
Satellite Simulator Settings (Step 11)
66 45 Aaron Harper
67 45 Aaron Harper
!http://opendesignengine.net/dmsf_files/445?download=!
68 45 Aaron Harper
Strong signal test (Step 12)
69 45 Aaron Harper
70 45 Aaron Harper
!http://opendesignengine.net/dmsf_files/449?download=!
71 45 Aaron Harper
Three meter test setup (Step 15)
72 45 Aaron Harper
73 45 Aaron Harper
!http://opendesignengine.net/dmsf_files/448?download=!
74 45 Aaron Harper
Three meter test setup (Step 15), measurement detail
75 45 Aaron Harper
76 45 Aaron Harper
!http://opendesignengine.net/dmsf_files/444?download=!
77 45 Aaron Harper
Satellite simulator settings (Step 16)
78 45 Aaron Harper
79 45 Aaron Harper
!http://opendesignengine.net/dmsf_files/443?download=!
80 45 Aaron Harper
Final lab test (Step 17)
81 45 Aaron Harper
82 45 Aaron Harper
"Audio output of final lab test":http://opendesignengine.net/dmsf_files/442?download=
83 45 Aaron Harper
84 45 Aaron Harper
"Raw baseline (I/Q) data of final lab test":https://drive.google.com/file/d/0B5tu2_0_mvfAXzhzb3JLM2dVR1E/edit?usp=sharing
85 45 Aaron Harper
 
86 43 Aaron Harper
*LAB TEST PROCEDURE COMPLETE*
87 1 J. Simmons
88 1 J. Simmons
89 1 J. Simmons
90 1 J. Simmons
91 1 J. Simmons
92 1 J. Simmons
93 1 J. Simmons
94 11 Greg Moran
95 11 Greg Moran
96 11 Greg Moran
97 11 Greg Moran
98 11 Greg Moran
h2. Test 2: Field Test
99 11 Greg Moran
100 21 Jeremy Wright
Long range field test using low power transmitter at 915 MHz to verify the predicted link budget (which comes from <insert link to spreadsheet> analysis) and confirm signal reception.  It is recommended to conduct this test with at least 2 individuals.  These instructions assume that the receiver is already assembled and most recent software is installed.  If not, accomplish the next 2 steps.
101 8 Greg Moran
# Follow the instruction for "GroundSphere Kit assembly"
102 1 J. Simmons
# Follow the instructions for Operations Manual - "Getting Started and Set up"
103 1 J. Simmons
104 1 J. Simmons
105 1 J. Simmons
Test Date: _________________________________   Test Location: ___________________________________________
106 1 J. Simmons
107 1 J. Simmons
Record Test Conditions: _________________________________________________________________________
108 10 Greg Moran
109 11 Greg Moran
*Additional Tools Needed:*
110 27 Aaron Harper
Laptop computer meeting or exceeding the minimum system requirements.
111 10 Greg Moran
Portable table or truck bed (on which to set up receiver equip and computer)
112 27 Aaron Harper
Access to 120V a/c power for preamp (generator or car inverter) or DC adapter (vehicle power jack to 2.1mm preamp power jack).
113 10 Greg Moran
Tape measure or distance finding equipment (GPS?)
114 1 J. Simmons
115 9 Greg Moran
*Safety concerns:*
116 1 J. Simmons
Weather caution
117 1 J. Simmons
Traffic caution
118 1 J. Simmons
Portable power for equipment(?)
119 10 Greg Moran
120 1 J. Simmons
*Outcome*
121 10 Greg Moran
* Partial verification of technical requirement 1.1.2, 
122 10 Greg Moran
* Confirmation of Ground Sphere performance in optimal fielded conditions
123 1 J. Simmons
* Confirmation of Ground Sphere performance at a far distance to simulate orbital conditions
124 1 J. Simmons
125 11 Greg Moran
*Instructions:*
126 24 Aaron Harper
> Mission Control Set Up
127 10 Greg Moran
# [ ] Set up receiver and computer on portable table or in a vehicle with the antenna outside.
128 10 Greg Moran
# [ ] Turn on computer
129 1 J. Simmons
# [ ] Plug the GroundSphere USB data connector into an open USB port
130 1 J. Simmons
# [ ] Plug the GroundShpere power cord into a standard 120v power outlet
131 1 J. Simmons
# [ ] Launch the SeeDeR version 0.1 software
132 33 Aaron Harper
# [ ] Tune the SeeDeR version 0.1 software to receive 915 MHz
133 33 Aaron Harper
# [ ] Position the cursor (red vertical bar) at 915 MHz on the horizontal axis
134 33 Aaron Harper
# [ ] Record the noise floor signal level: _________ dBm
135 24 Aaron Harper
# [ ] Move to a distance 2650 meters away from the receiver set up with a clear line of sight, then set up the transmitter
136 33 Aaron Harper
# [ ] If not exactly the above distance, record the distance between transmitter and receiver: _______________(in m) 
137 11 Greg Moran
> Remote transmit site Set Up
138 43 Aaron Harper
# [ ] Power on and tune the transmitter to 915 MHz. "Instructions":https://opendesignengine.net/projects/groundsphere-test-rig/wiki/Operating_Manual
139 1 J. Simmons
# [ ] Set transmitter power to 0dBm _NOTE: (This is a reasonably strong terrestrial signal, and is an unrealistically high power to expect from SkyCube)_
140 10 Greg Moran
# [ ] Tune the SeeDeR software to receive 915 MHz
141 28 Aaron Harper
# [ ] Observe and capture/record the transmitted signal received by GroundSphere from the test transmitter
142 1 J. Simmons
# [ ] Position the cursor (red vertical bar) at the center peak of the displayed radio signal on the horizontal axis
143 33 Aaron Harper
# [ ] The signal should be plainly obvious as a strong peak above the noise floor.  If this is not the case, abort the test and troubleshoot. 
144 43 Aaron Harper
# [ ] Set the transmitter power level to -20dBm.  _NOTE: (at this power level, we are simulating the signal that we expect to receive form SkyCube as it flies directly overhead of the antenna, given its orbital parameters.  See the Outdoor Test Link Budget "here":https://docs.google.com/spreadsheet/ccc?key=0Aptu2_0_mvfAdEZLRWNaQ2lmWHBzSzJiTkFYZHhKZ1E&usp=sharing)_
145 43 Aaron Harper
> Testing
146 1 J. Simmons
# [ ] Observe and capture/record the transmitted signal received by GroundSphere from the test transmitter
147 33 Aaron Harper
# [ ] Position the cursor (red vertical bar) at the center peak of the displayed radio signal on the horizontal axis
148 33 Aaron Harper
# [ ] Record the radio signal level: _________ dBm
149 33 Aaron Harper
# [ ] Subtract the noise floor figure recorded earlier from the radio signal level recorded in the step above.
150 33 Aaron Harper
# [ ] Record the difference between the signals: _________ dBm
151 33 Aaron Harper
# [ ] The difference between the signal and noise floor should be at least 17dBm.  If this is not the case, abort the test and troubleshoot.  
152 10 Greg Moran
153 10 Greg Moran
<insert image of receiver setup> 
154 1 J. Simmons
<insert image of transmitter setup> 
155 10 Greg Moran
<insert screenshot image of computer screen showing high power 915 MHz signal> 
156 10 Greg Moran
<insert screenshot image of computer screen showing low power 915 MHz signal>
157 10 Greg Moran
158 43 Aaron Harper
*FIELD TEST PROCEDURE COMPLETE*
159 8 Greg Moran
160 8 Greg Moran
161 8 Greg Moran
162 8 Greg Moran
163 8 Greg Moran
164 1 J. Simmons
165 8 Greg Moran
h2. Test 3: From Orbit Test
166 8 Greg Moran
167 10 Greg Moran
acquire signal from orbiting cubesat operating on 915 MHz (NPS just launched two cubesats which use the same radio and configuration as SkyCube).  Orbital prediction software will need to be used to calculate the appropriate timing for this test.  It is only possible to conduct the steps below in anticipation of a 915 MHz signal source flying overhead.  These instructions assume that the receiver is already assembled and most recent software is installed.  If not, accomplish the next 2 steps.
168 8 Greg Moran
# Follow the instruction for "GroundSphere Kit assembly"
169 1 J. Simmons
# Follow the instructions for Operations Manual - "Getting Started and Set up"
170 8 Greg Moran
171 8 Greg Moran
172 1 J. Simmons
Test Date: _________________________________   Test Location: ___________________________________________
173 9 Greg Moran
174 1 J. Simmons
Record Test Conditions: _________________________________________________________________________
175 1 J. Simmons
176 9 Greg Moran
*Tools Needed:*
177 29 Aaron Harper
Ground Sphere test rig
178 29 Aaron Harper
Computer meeting min system reqs
179 9 Greg Moran
Skycube satellite pass within range of receiving station.
180 9 Greg Moran
181 1 J. Simmons
182 9 Greg Moran
*Safety concerns:*
183 9 Greg Moran
Weather caution
184 9 Greg Moran
Traffic caution
185 9 Greg Moran
* 
186 1 J. Simmons
187 1 J. Simmons
*Outcome*
188 30 Aaron Harper
Verification and completion of Technical requirement 1.1.2
189 1 J. Simmons
190 1 J. Simmons
*Instructions:*
191 33 Aaron Harper
# [ ] Set up receiver and computer on portable table or in a vehicle with the antenna outside
192 1 J. Simmons
# [ ] Turn on computer
193 1 J. Simmons
# [ ] Plug the GroundSphere USB data connector into an open USB port
194 32 Aaron Harper
# [ ] Plug the GroundShpere power cord into a standard 120v power outlet
195 32 Aaron Harper
# [ ] Launch the SeeDeR version 0.1 software
196 1 J. Simmons
# [ ] Tune the SeeDeR software to receive 915 MHz
197 33 Aaron Harper
# [ ] Position the cursor (red vertical bar) at 915 MHz on the horizontal axis
198 33 Aaron Harper
# [ ] Record the noise floor signal level: _________ dBm
199 1 J. Simmons
# [ ] Await Skycube satellite pass as predicted by gpredict or other prediction software
200 1 J. Simmons
# [ ] Observe and capture/record the transmitted signal received by GroundSphere
201 33 Aaron Harper
# [ ] Record the closest approach as shown by the polar plot (sky view) on GPredict: ______ degrees elevation
202 1 J. Simmons
# [ ] Position the cursor (red vertical bar) at the center peak of the displayed radio signal on the horizontal axis
203 33 Aaron Harper
# [ ] Record the radio signal level: _________ dBm
204 33 Aaron Harper
# [ ] Subtract the noise floor figure recorded earlier from the radio signal level recorded in the step above
205 33 Aaron Harper
# [ ] Record the difference between the signals: _________ dBm
206 33 Aaron Harper
# [ ] If the difference between the signal received from Sky Cube and noise floor is 17dBm or greater, the AX-25 packet should be decoded by the SeeDeR software.  Save a screenshot of this event.
207 43 Aaron Harper
# [ ] Find the anticipated signal strength in the "link budget":https://docs.google.com/spreadsheet/ccc?key=0Aptu2_0_mvfAdHhfU2JMSFdhamYtVTRHcmRpTXEzRmc&usp=sharing given the elevation of the closest approach and compare this figure to the received signal.  
208 33 Aaron Harper
# [ ] Record any substantial difference: ______________________________________________________________
209 8 Greg Moran
210 9 Greg Moran
<insert screenshot image of computer screen showing signal received from satellite>
211 39 Greg Moran
<insert pic of Test hardware set up> 
212 8 Greg Moran
213 43 Aaron Harper
*FROM ORBIT TEST PROCEDURE COMPLETE*