PY18 Sprint 1A Stand Up 1

Very busy and productive first week of Spring 1A. Lots of progress on the new tone ring, the controller, and the desktop app.
Added by J. Simmons 16 days ago

J's Report

  • Did
    • Posted sprint plan to Holoseat news channel
    • RAT-12: Ask legal aid about collecting health data and verify requirements for data security
      • Looked into DC legal aid (it was a bust)
      • Organized questions for legal aid
    • PIC-01: Submit application to Crowd Supply to see if they would be interested in Holoseat
      • Researched application for CrowdSupply (discovered, again, we need a price point for the application)
      • Prepared a Google Doc to capture answers to CrowdSupply application
    • V04-51: Implement Serial Monitor feature
      • Designed common elements for Holoseat app (enable button, profile selector, and cadence display)
      • Designed Serial Monitor UI
      • Started implementing Serial Monitor UI
      • Implemented REST API framework
      • Implemented first few REST API methods (and their counterparts in HSP)
    • V04-49: Implement python serial library for accessing new version of HSP
      • Replaced old manual string parsing code in firmware with Arduino JSON library
      • Developed first draft of Holoseat serial library (nearly feature complete, need to discuss versioning scheme to finalize board checks)
    • V04-14: Select tone ring based on ease to adapt, costs, identical or faster response times, improved single step
      • Provided feedback and test prints for tone ring development
  • Will do
    • V04-51: Implement Serial Monitor feature - Finish implementing Serial Monitor
    • V04-14: Select tone ring based on ease to adapt, costs, identical or faster response times, improved single step - Continue supporting tone ring development (including review about injection molding and printing on TechShop 3D printer)
  • Blocked?
    • no

Bryan's Report

  • Did
    • V04-26: Assemble a test Wings to verify design (on proto-wing) - partially assembled test wing, focused on layout this week
    • V04-71: Branding on keycap - done and key caps ordered
    • V04-59: Design scheme for checking the hardware version so the software can find compatibility - discussed hardware versioning with volunteer
    • V04-14: Select tone ring based on ease to adapt, costs, identical or faster response times, improved single step
      • Worked with volunteer on design
      • ordered magnets
  • Will do
    • SME-01: Get Jazmint signed up for Lastpass so we can share passwors securely for social media
    • SME-02: Split social media accounts out into a seperate folder
    • SME-03: share only the social media folder with Jazmint
    • V04-26: Assemble a test Wings to verify design (on proto-wing)
    • V04-59: Design scheme for checking the hardware version so the software can find compatibility
    • V04-14: Select tone ring based on ease to adapt, costs, identical or faster response times, improved single step
    • Other branding work while we have volunteer available
    • Write a blog post and/or a message to alpha testers
  • Blocked?
    • traveling for work