PY18 Sprint 1A Stand Up 1

Very busy and productive first week of Spring 1A. Lots of progress on the new tone ring, the controller, and the desktop app.
Added by J. Simmons 9 months ago

J's Report

  • Did
    • Posted sprint plan to Holoseat news channel
    • RAT-12: Ask legal aid about collecting health data and verify requirements for data security
      • Looked into DC legal aid (it was a bust)
      • Organized questions for legal aid
    • PIC-01: Submit application to Crowd Supply to see if they would be interested in Holoseat
      • Researched application for CrowdSupply (discovered, again, we need a price point for the application)
      • Prepared a Google Doc to capture answers to CrowdSupply application
    • V04-51: Implement Serial Monitor feature
      • Designed common elements for Holoseat app (enable button, profile selector, and cadence display)
      • Designed Serial Monitor UI
      • Started implementing Serial Monitor UI
      • Implemented REST API framework
      • Implemented first few REST API methods (and their counterparts in HSP)
    • V04-49: Implement python serial library for accessing new version of HSP
      • Replaced old manual string parsing code in firmware with Arduino JSON library
      • Developed first draft of Holoseat serial library (nearly feature complete, need to discuss versioning scheme to finalize board checks)
    • V04-14: Select tone ring based on ease to adapt, costs, identical or faster response times, improved single step
      • Provided feedback and test prints for tone ring development
  • Will do
    • V04-51: Implement Serial Monitor feature - Finish implementing Serial Monitor
    • V04-14: Select tone ring based on ease to adapt, costs, identical or faster response times, improved single step - Continue supporting tone ring development (including review about injection molding and printing on TechShop 3D printer)
  • Blocked?
    • no

Bryan's Report

  • Did
    • V04-26: Assemble a test Wings to verify design (on proto-wing) - partially assembled test wing, focused on layout this week
    • V04-71: Branding on keycap - done and key caps ordered
    • V04-59: Design scheme for checking the hardware version so the software can find compatibility - discussed hardware versioning with volunteer
    • V04-14: Select tone ring based on ease to adapt, costs, identical or faster response times, improved single step
      • Worked with volunteer on design
      • ordered magnets
  • Will do
    • SME-01: Get Jazmint signed up for Lastpass so we can share passwors securely for social media
    • SME-02: Split social media accounts out into a seperate folder
    • SME-03: share only the social media folder with Jazmint
    • V04-26: Assemble a test Wings to verify design (on proto-wing)
    • V04-59: Design scheme for checking the hardware version so the software can find compatibility
    • V04-14: Select tone ring based on ease to adapt, costs, identical or faster response times, improved single step
    • Other branding work while we have volunteer available
    • Write a blog post and/or a message to alpha testers
  • Blocked?
    • traveling for work