2017 Sprint 3 Stand Up 6

We crossed a big hurdle: the new sensors are integrated and work great!
Added by J. Simmons about 8 years ago

J's Report

  • Did
    • SYN-03: Develop and test the firmware for SyndCon 2017 demo units merging v0.3 controller (Feather) with v0.4 sensor configuration - done (I hope)
    • SYN-22: Design and print business cards for J and Bryan - emailed Ingrid on Sun(?), no word back yet; also IM'ed today
    • SYN-29: Prep Twitter and Facebook accounts for Holoseat - emailed Ingrid on Sun(?), no word back yet; also IM'ed today
    • SYN-07: Identify and pack 2 appropriate gaming laptops based on selected game (be sure to include Holoseat controller app and dev tools) - wiped machine, ready to set it up when Bryan gets to DC
    • SYN-26: Prepare slides and script for the Holoseat panel emphasizing our pre-sales initiative - took more raw video (of v0.3.5) and filled in more slides
  • Will do
    • SYN-22: Design and print business cards for J and Bryan - will continue to reach out to Ingrid
    • SYN-29: Prep Twitter and Facebook accounts for Holoseat - will continue to reach out to Ingrid
    • SYN-26: Prepare slides and script for the Holoseat panel emphasizing our pre-sales initiative - continue working on slides
    • Review pre-sales contract from Bryan
    • Review controller box CAD files
  • Blocked?
    • work and life

Bryan's Report

  • Did
    • prepared draft legalize for testing pre-sales agreement
    • started the updates BoM and estimate down payment cost (review, etc)
    • SYN-04: Develop a controller "box" that mounts on Desk Cycle in the same place their bike computer mounts - volunteer has produced draft parts, they need someone to review
    • have updated sensors for the demo units
  • Will do
    • SYN-04: Develop a controller "box" that mounts on Desk Cycle in the same place their bike computer mounts - will take CAD models to VT for review/printing
    • SYN-11: Refresh the demo surveys - revise rough cut survey
    • SYN-10: Build Holoseat packing box - will work on the box
    • Will produce updated controller for v0.3.5 and update to new firmware to test (noting the pin change for the ethernet jack and the new resistors)
    • SYN-16: Have 4 branded t-shirts made for each of Bryan and J - will have a design for review shortly
  • Blocked?
    • have company coming in this weekend
    • may get pulled into a work project asap that must be done after hours