2017 Sprint 3 Stand Up 5

The prep work for SyndCon is really coming along. 2-1/2 weeks to go. The new demo units are almost ready and the event work is coming along.
Added by J. Simmons 3 months ago

J's Report

  • Did
    • SYN-03: Develop and test the firmware for SyndCon 2017 demo units merging v0.3 controller (Feather) with v0.4 sensor configuration - updated test rig, did initial proof of concept for using new sensor, drafted key changes for updated firmware
    • SYN-12: Design and print a horizontal "brand banner" for display on wall over demo units - done
    • SYN-13: Design, print, and frame on site 24"x36" marketing poster - done
    • SYN-22: Design and print business cards for J and Bryan - have updated design
    • SYN-27: Finalize the definition and marketing language for the pre-sales initiative - done
    • DEV-31: Identify a tone ring that will work with Desk Cycle and selected sensor - done (based on SYN-03 work)
    • SYN-29: Prep Twitter and Facebook accounts for Holoseat - Ingrid has a first draft
    • SYN-26: Prepare slides and script for the Holoseat panel emphasizing our pre-sales initiative - took video/pictures for slides
  • Will do
    • SYN-03: Develop and test the firmware for SyndCon 2017 demo units merging v0.3 controller (Feather) with v0.4 sensor configuration - write new firmware
    • SYN-22: Design and print business cards for J and Bryan - will get updated design approval to Ingrid and have her order cards
    • SYN-29: Prep Twitter and Facebook accounts for Holoseat - will iterate with Ingrid
    • SYN-07: Identify and pack 2 appropriate gaming laptops based on selected game (be sure to include Holoseat controller app and dev tools) - will start prepping my laptop per plan
    • SYN-26: Prepare slides and script for the Holoseat panel emphasizing our pre-sales initiative - add slides to the pre-sales section based on new marketing language and take more video/pictures for slides
  • Blocked?
    • Still have all sorts of personal stuff going on
    • Work travel happening again

Bryan's Report

  • Did
    • BIZ-17: Research product liability insurance so that we are properly covered for our pre-sales at SyndCon - done, including an example to build our own revised agreement for testing
  • Will do
    • SYN-11: Refresh the demo surveys - revise rough cut survey
    • prepare draft legalize for testing pre-sales agreement
    • update BoM and estimate down payment cost
    • SYN-10: Build Holoseat packing box - will work on the box
    • SYN-04: Develop a controller "box" that mounts on Desk Cycle in the same place their bike computer mounts - will check on volunteer's progress
    • should have updated sensors for the demo units
  • Blocked?
  • still on vacation
  • work will be busy post vacation