2017 Sprint 3 Stand Up 4

Still lots to do for this year's convention, but we are making steady progress.
Added by J. Simmons 4 months ago

J's Report

  • Did
    • SYN-11: Refresh the demo surveys - worked with Bryan at last week's meeting to get the rough edits complete
    • SYN-22: Design and print business cards for J and Bryan - finalized design with Ingrid (no QR code this year)
    • SYN-25: Prepare slides and script for Main Guild Meeting section (keep it short as always) emphasizing our pre-sales initiative - started planning actual slides from outline
    • SYN-26: Prepare slides and script for the Holoseat panel emphasizing our pre-sales initiative - started planning actual slides from outline
    • SYN-27: Finalize the definition and marketing language for the pre-sales initiative - met with Ingrid to review what we need
    • SYN-29: Prep Twitter and Facebook accounts for Holoseat - Confirmed Ingrid is working on this task, she should be done this week
  • Will do
    • SYN-03: Develop and test the firmware for SyndCon 2017 demo units merging v0.3 controller (Feather) with v0.4 sensor configuration - update test rig to work with tone ring and new sensor, begin initial firmware development
    • SYN-12: Design and print a horizontal "brand banner" for display on wall over demo units - will print
    • SYN-13: Design, print, and frame on site 24"x36" marketing poster - will print
    • SYN-22: Design and print business cards for J and Bryan - will check in with Ingrid
    • SYN-27: Finalize the definition and marketing language for the pre-sales initiative - will check with Ingrid
    • SYN-29: Prep Twitter and Facebook accounts for Holoseat - will check with Ingrid
  • Blocked?
    • Was blocked on poster/banner printing (miscommunication about the PDFs), but that is resolved
    • Still have all sorts of personal stuff going on
    • Waiting on content for SYN-22, SYN-27, and SYN-29

Bryan's Report

  • Did
    • SYN-11: Refresh the demo surveys - worked with J at last week's meeting to get the rough edits complete
    • SYN-03: Develop and test the firmware for SyndCon 2017 demo units merging v0.3 controller (Feather) with v0.4 sensor configuration - sent J v0.4 hardware
    • SYN-06: Select and purchase 2 tables worth of table height adjusters - ordered enough for one table (in hindsight we should be good with one table's worth)
    • DEV-31: Identify a tone ring that will work with Desk Cycle and selected sensor - finished assembly of both tone rings
    • SYN-10: Build Holoseat packing box - worked on materials gathering
  • Will do
    • SYN-11: Refresh the demo surveys - revise rough cut survey
    • BIZ-17: Research product liability insurance so that we are properly covered for our pre-sales at SyndCon - start research
  • Blocked?
    • DEV-33 - lacked some of the required equipment, handing over to J as part of firmware work (SYN-03)
    • on vacation for a full week (including during next stand up)

Next Week's Joint Work

  • Trip planning