2017 Sprint 1 Stand Up 3 (belated)

Getting development work moving again after hitting some blocks last week
Added by J. Simmons 6 months ago

Both Bryan and I ran into more blocks (business travel and long work hours for J, unplanned family visits and external demands for Bryan) than we expected last week. The results are little progress made last week (but things are starting to move again) and missing our stand up date. So, here is our belated stand up 3 for this sprint.

J's Report

  • Did
    • Published Sprint 1 blog post
    • Get newsletter published - sent Ingrid an email about the next newsletter
    • DEV-10: Select BT HID module from CHIP's BT module or an external one / DEV-11: Select BT Host module from CHIP's BT module or an external one - finished documenting research and findings
    • DEV-02: Determine if we should use a tone ring vs. existing single magnet design - as part of prep work, did some research on tone rings and discovered there are low cost/high sensitivity commercial sensors/tone rings that report speed and direction; we should seriously consider switching to one of these options in place of our current sensor board as they cost less and offer higher resolution than anything we could build from scratch
    • DEV-15: Port the controller side RJ-45 wiring from the v0.3 controller to the v0.4 controller / DEV-17: Port physical switch wiring from v0.3 to v0.4 - see v0.4 Fritzing Files
  • Will do
    • DEV-02: Determine if we should use a tone ring vs. existing single magnet design - continue research and document my findings with the idea of selecting one or more options to consider testing out
    • Get newsletter published - if possible
    • BIZ-09: Submit books for tax accounting - package and send materials to accountant
    • BIZ-03: Generate required reports and confirm accuracy - need to check with Bryan about process
  • Blocked?
    • Get newsletter published - waiting for word back from Ingrid about the newsletter
    • BIZ-03: Generate required reports and confirm accuracy - need documentation from Bryan about how/where (BIZ-05)

Bryan's Report

  • Did
    • DEV-06: Test Keyboard USB HID over USB-Gadget - got docker installed on laptop
    • BIZ-09: Submit books for tax accounting - Ran the reports for 2016 tax filing
    • BIZ-01: Identify what reports need to be generated - completed
    • BIZ-02: Confirm where the reports should be submitted - completed
  • Will do
    • BIZ-05: Create LLC documentation covering regular reporting requirements (what, when, how, where) - will write this up
    • CAMP-01: Review articles/information from Fred Hicks regarding kickstarter campaigns - will post links to articles on Discord
    • DEV-06: Test Keyboard USB HID over USB-Gadget - continue with cross compiling tests in docker environment
  • Blocked?
    • DEV-03: Fix Bug #276 (Sensors are 5v logic feeding into 3.3v inputs on the controller) - Realized no longer seem to own a volt meter, need to buy a new one
    • May not be available for stand up 4 due to potential schedule conflict for work
    • BIZ-11: Define schedule for checking and applying updates to website - waiting on license key for last plugin
      • J still waiting for info from Ingrid