PY18 Sprint 2 Stand Up 6

Had some ups and downs this week, but we are closing in on completing this sprint on schedule and ordering the last few parts for the Alphas!!
Added by J. Simmons 3 months ago

J's Report

  • Did
    • V10-04: Test mount adhesive - printed a test article of the sensor mount, attached to a non-critical location on bike, allowed it to cure, and stress tested the bond; complete success!!
  • Will do
    • V04-13: Test the tone rings against the behavior of the existing 12 pole 3D printed design (at least same performance, but looking for faster response times and improved single stepping) - start work on converting new tone ring to tool-free design
    • SME-09: Publish at least one blog post in Feb - finish draft blog post
  • Blocked?
    • Recovering from being sick, so less blocked than have very little capacity

Bryan's Report

  • Did
    • V04-58: Implement hardware versioning system that can be detected by Holoseat software - test done and passed!
    • V04-23: Modify Adafruit Wing to handle the required components and have the necessary headers - completed layout, need review then can claim done
    • BIZ-03: Work with Legal on Trademark Filing - got corrected image files of updated logo
  • Will do
    • BIZ-03: Work with Legal on Trademark Filing - follow up with legal; publish updated logos
    • BIZ-04: Work with legal on finalizing any updates to testing agreement - follow up with legal
    • V04-25: Order initial test run of board for Wing - place order
    • V04-26: Assemble a test Wings to verify design (on proto-wing) - build J's wing and sent out to J
    • PIC-01: Submit application to Crowd Supply to see if they would be interested in Holoseat - start researching surface mount shops
  • Blocked?
    • BIZ-03: Work with Legal on Trademark Filing - waiting on legal
    • BIZ-04: Work with legal on finalizing any updates to testing agreement - waiting on legal

Note:
Completing V10-04 also let us knock out two more PBIs

  • V10-03: Research sensor mount adhesives
  • V10-05: Select mount adhesive

Comments

Added by Heather Donahue about 1 month ago

I am really glad I’ve found this information. Nowadays bloggers publish only about gossips and internet and this is really frustrating. this is what I need. Thanks for keeping this website, I will be visiting it. I was searching for something like this for quite a long time and at last I’ve found it on your blog. I am really impressed with your efforts and really pleased to visit this post like [[https://triumphessays.com/about_us]]. It was definitely interesting for me.

Added by Alison Daewon 9 days ago

On the version switch side, start using the concept of branching and tagging Write My Essay for planning development sandboxes and for identifying releases.