PY18 Sprint 2 Stand Up 5

Half way through the sprint and wrapping up some huge tasks, most related to manufacturing the Alphas. Still have lots to do though, so the next 4 weeks will be busy.
Added by J. Simmons 3 months ago

J's Report

  • Did
    • V04-13: Test the tone rings against the behavior of the existing 12 pole 3D printed design (at least same performance, but looking for faster response times and improved single stepping) - got magnets, printed full disc tone ring, assembled test tone ring, and tested it; got clear signals to sensor!
  • Will do
    • V04-13: Test the tone rings against the behavior of the existing 12 pole 3D printed design (at least same performance, but looking for faster response times and improved single stepping) - start work on converting new tone ring to tool-free design
    • SME-09: Publish at least one blog post in Feb - finish draft blog post
    • BIZ-05: Communication plan - read "defining customer" and "marketing plan for makers" blog posts
    • V10-04: Test mount adhesive - will print a test article of the sensor mount, attach to a non-critical location on bike, allow to cure, and then stress test the bond
  • Blocked?
    • none, but at reduced capacity next week

Bryan's Report

  • Did
    • V04-22: Load Adafruit wing design into CircuitMaker - done
    • V04-23: Modify Adafruit Wing to handle the required components and have the necessary headers - very close to having this done (down to just a few more connections
  • Will do
    • V04-23: Modify Adafruit Wing to handle the required components and have the necessary headers - will complete v1 Rev 2 wing design file in CircuitMaker
    • BIZ-03: Work with Legal on Trademark Filing - follow up with legal; get corrected PNGs of updated logo
    • BIZ-04: Work with legal on finalizing any updates to testing agreement - follow up with legal
    • V04-58: Implement hardware versioning system that can be detected by Holoseat software - will wrap up by running ohm test sketch on test wing
  • Blocked?
    • BIZ-03: Work with Legal on Trademark Filing - waiting on legal
    • BIZ-04: Work with legal on finalizing any updates to testing agreement - waiting on legal

Comments