PY18 Sprint 2 Stand Up 2

Final designs are coming together for the alpha hardware and business activities are also moving forward.
Added by J. Simmons 4 months ago

J's Report

Note: Over estimated capacity this week (needed recovery time from travel), so only got about half of committed work done.

  • Did
    • V04-13: Test the tone rings against the behavior of the existing 12 pole 3D printed design (at least same performance, but looking for faster response times and improved single stepping) - sent Bryan a set of tone ring parts
    • SME-08: Publish at least one blog post in Jan. - got about half of draft post moved over to wordpress (needs way more editing than I realized)
  • Will do
    • SME-08: Publish at least one blog post in Jan. - will finish and publish this post
    • V04-28: Design a housing in Fusion 360 for the sensor and TRRS jack (Sensor Housing) - start working on the CAD model
  • Blocks
    • none

Bryan's Report

  • Did
    • V04-26: Assemble a test Wings to verify design (on proto-wing) - Built Wing other than version circuit which required parts that had not arrived
    • BIZ-01: Prep books for taxes - done
    • BIZ-03: Work with Legal on Trademark Filing - met with legal
  • Will do
    • V04-26: Assemble a test Wings to verify design (on proto-wing) - Add version circuit to first wing, work out layout to improve second wing, start building second wing
    • BIZ-03: Work with Legal on Trademark Filing - Work w/ J to decide what we want to do trademark wise to push that forward; Get circle R changed to TM on logos
    • Ship Parts to J
    • V04-13: Test the tone rings against the behavior of the existing 12 pole 3D printed design (at least same performance, but looking for faster response times and improved single stepping) - Put new tone ring together
  • Blocks
    • none