Testing

Version 3 (J. Simmons, 12/08/2013 08:22 pm)

1 1 J. Simmons
h1. Testing
2 1 J. Simmons
3 3 J. Simmons
This document contains Test and Evaluation Master Plan (TEMP) for both the prototype and production QA.  The prototype plan is designed to ensure the design meets with the specified [[Requirements Document|requirements]].  The QA plan is designed to ensure kits meet quality requirements before being shipped to a customer.
4 1 J. Simmons
5 1 J. Simmons
{{toc}}
6 1 J. Simmons
7 3 J. Simmons
h2. Prototype TEMP
8 1 J. Simmons
9 3 J. Simmons
Prototype test and evaluation cover the full range of ground station functions.  This includes satellite tracking, signal acquisition, "space tweet" decoding.  Additionally, the assembly process will be tested in later prototypes. 
10 1 J. Simmons
11 3 J. Simmons
|_.Requirement |_.Requirement Title                             |_.Verification Method |_.Version |_.Status  |_.Notes                       |
12 3 J. Simmons
|TR 1.1.1          |Predict SkyCube flyover opportunities |Demonstration           |v0.1         |Pass (2013.12.05)  |Using 3rd party tool, "GPredict":http://gpredict.oz9aec.net/ which meets requirement |
13 3 J. Simmons
|TR 1.1.2          |Receive radio signals on 915 MHz       |Test                           |v0.1         |TBD                        |[[Test 1.1.2 Instructions]] |
14 1 J. Simmons
15 3 J. Simmons
h2. QA TEMP
16 1 J. Simmons
17 1 J. Simmons
tbd