Operating Manual
Version 2 (Jeremy Wright, 04/07/2014 03:07 pm)
| 1 | 1 | Jeremy Wright | h1. Ground Sphere Test Transmitter Operating Manual v0.1 |
|---|---|---|---|
| 2 | 1 | Jeremy Wright | |
| 3 | 1 | Jeremy Wright | {{toc}} |
| 4 | 1 | Jeremy Wright | |
| 5 | 1 | Jeremy Wright | h2. Hardware/Software |
| 6 | 1 | Jeremy Wright | |
| 7 | 1 | Jeremy Wright | The [[Bill of Materials|BoM]] outlines the components needed for this unit to be functional. For lab testing purposes the TI Launchpad can be connected directly to a laptop and not powered by the battery. |
| 8 | 1 | Jeremy Wright | |
| 9 | 1 | Jeremy Wright | h3. User provided laptop, minimum system requirements |
| 10 | 1 | Jeremy Wright | |
| 11 | 1 | Jeremy Wright | * Windows 7 operating system |
| 12 | 1 | Jeremy Wright | * 1GHz single core CPU |
| 13 | 1 | Jeremy Wright | * 1GB RAM |
| 14 | 1 | Jeremy Wright | * Open USB port |
| 15 | 1 | Jeremy Wright | |
| 16 | 1 | Jeremy Wright | The "Quick Start Guide":http://www.ti.com/lit/ml/swru312b/swru312b.pdf for the Air BoosterPack outlines the instructions to combine the Launchpad evaluation unit and the boosterpack. These instructions will bring the unit up to a point where it is running the example program used for testing. |
| 17 | 1 | Jeremy Wright | |
| 18 | 1 | Jeremy Wright | h2. Power Level Setting |
| 19 | 1 | Jeremy Wright | |
| 20 | 2 | Jeremy Wright | TODO: Add power level setting instructions here. |