h1. Ground Sphere Test Transmitter - Initial Questions v0.1
2 1 Jeremy Wright
3 1 Jeremy Wright
{{toc}}
4 1 Jeremy Wright
5 1 Jeremy Wright
h2. Project Background Questions
6 1 Jeremy Wright
7 1 Jeremy Wright
h3. BQ1. Why are we making this?
8 1 Jeremy Wright
9 14 Jeremy Wright
*BA1*. _There are two reasons for building this test transmitter.  First, it helps to have an initial "smoke test" for the *Ground Sphere Ground Station*. What this means is that when someone assembles a copy of the Ground Sphere hardware, they should be able to easily test it to make sure that nothing major is wrong.  Second, there are very few other 915 MHz satellites in orbit that are useful for testing the *Ground Sphere Ground Station* at the time of this project's inception.  Having a test apparatus like this allows us to simulate satellite reception through terrestrial tests and possibly even High Altitude Balloon launches._
10 1 Jeremy Wright
11 1 Jeremy Wright
h3. BQ2. Who is this for?
12 1 Jeremy Wright
13 20 Jeremy Wright
*BA2.* _The *Ground Sphere Ground Station* is for "SkyCube backers":http://www.kickstarter.com/projects/880837561/skycube-the-first-satellite-launched-by-you/backers, students, teachers, scouting troops, space enthusiasts, and anyone who wishes to directly participate in the SkyCube mission. Therefore, this test transmitter is intended for the same audience._
14 1 Jeremy Wright
15 1 Jeremy Wright
h3. BQ3. How will this be used?
16 1 Jeremy Wright
17 7 Jeremy Wright
*BA3*. _Ground Sphere Ground Station operators will use the test transmitter to:_
18 1 Jeremy Wright
19 18 Jeremy Wright
* _Do an initial test to make sure that the *Ground Sphere* hardware is capable of receiving 915 MHz transmissions in a laboratory environment._
20 19 Jeremy Wright
* _Do an initial test to ensure that the *Ground Sphere* hardware is capable of receiving 915 MHz transmissions at a receive signal strength equivalent to a satellite on orbit._
21 7 Jeremy Wright
22 1 Jeremy Wright
h3. BQ4. Who's going to build this?
23 1 Jeremy Wright
24 1 Jeremy Wright
*BA4.*  _The designs will be open so that anyone, without necessarily a technical education in amateur radio or satellite operations, would be able to build and operate a *Ground Sphere Test Transmitter*._
25 1 Jeremy Wright
26 1 Jeremy Wright
h2. Technical Requirement Questions
27 1 Jeremy Wright
28 1 Jeremy Wright
h3. TQ1a. What features does it need to have (now)?
29 1 Jeremy Wright
30 7 Jeremy Wright
*TA1a.* _The test transmitter needs to:_
31 1 Jeremy Wright
32 7 Jeremy Wright
* _Transmit radio signals at 915 MHz_
33 21 Jeremy Wright
* _Be mobile so that the terrestrial tests can be done by adding distance between the transmitter and *Ground Sphere* receiver_
34 1 Jeremy Wright
* _Be easy to assemble from kit components and only require simple tools (screw drivers, pliers, wrenches, etc) for assembly_
35 1 Jeremy Wright
* _Have low shipping costs for the packaged kit_
36 1 Jeremy Wright
* _All software required to operate the test transmitter must run on a Windows PC_
37 22 Jeremy Wright
* _The test transmitter must connect to the test transmitter programming computer through a commonly available port (for example: USB)_
38 1 Jeremy Wright
* _The test transmitter hardware should minimize the opportunity for mechanical failures (from things such as broken connectors or a lack of strain relief)_
39 1 Jeremy Wright
40 1 Jeremy Wright
h3. TQ1b. What features does it need to have (later)?
41 1 Jeremy Wright
42 1 Jeremy Wright
*TA1b.* _In the future, the project (or related projects) may need to:_
43 1 Jeremy Wright
44 1 Jeremy Wright
* _All software required to operate the ground station must run on Windows, OS X, and Linux_
45 8 Jeremy Wright
* _Transmit BPSK-modulated, unencrypted AX.25 data packets sent at 9600 baud_
46 1 Jeremy Wright
47 1 Jeremy Wright
h3. TQ2. What are the legacy requirements?
48 1 Jeremy Wright
49 1 Jeremy Wright
*TA2.* _To maintain compatibility with other projects, the system should:_
50 1 Jeremy Wright
51 1 Jeremy Wright
* _N/A_
52 1 Jeremy Wright
53 1 Jeremy Wright
h2. Project Requirement Questions
54 1 Jeremy Wright
55 1 Jeremy Wright
h3. PQ1. How many do we want to make?
56 1 Jeremy Wright
57 1 Jeremy Wright
*PA1.* _As an open source hardware kit, the long term objective is to promote and sell as many ground station kits to as large of an audience (schools, scouting troupes, makerspaces, space enthusiasts, etc) as possible.  However, the narrow focus on supporting SkyCube operations with the *Ground Sphere* may limit the number of kits which will be sold for this specific ground station, especially since the SkyCube is going to be on orbit for a very limited period of time.  The sales lifetime of this specific kit (and in turn the number of kits we will want to sell) will depend on how many other satellites there are to observe in the same frequency range as the SkyCube.  Note, there are approximately 2700 backers of the SkyCube KickStarter, of which Southern Stars is committed to delivering ground stations to between 20 and 30 backers.  This gives a minimum number of ground stations to be built of 30 +/- 5, which would cover the minimum backers and a handful for Mach 30's use._
58 1 Jeremy Wright
59 1 Jeremy Wright
_The timing of the project may also limit the scale of the initial run Mach 30 can produce.  This decision will be revisited later in the development process (after the second prototype) to allow the development team to address the manufacturing logistics._
60 1 Jeremy Wright
61 1 Jeremy Wright
h3. PQ2. What is the budget?
62 1 Jeremy Wright
63 7 Jeremy Wright
*PA2.* _The materials cost should be kept under $75 to limit the retail cost of any kit versions._
64 1 Jeremy Wright
65 1 Jeremy Wright
h3. PQ3. What is the timeline?
66 1 Jeremy Wright
67 1 Jeremy Wright
*PA3.* _The timeline for this project is dictated by the SkyCube launch and deployment timeline.  SkyCube is currently scheduled was launched in January 2014, with deployment from the ISS in Q1 or Q2 of 2014.  Southern Stars has stated they would be comfortable with a February 2014 delivery date for the kits._
68 1 Jeremy Wright
69 1 Jeremy Wright
h3. PQ4. What waste products will be produced by the manufacture and/or operation of this?
70 1 Jeremy Wright
71 1 Jeremy Wright
*PA4.* _TBD_