h1. Power/Temp Monitor and Control System (EPS/ECLSS) Initial Questions
2 1 Aaron Harper
3 6 Aaron Harper
{{toc}}
4 1 Aaron Harper
5 6 Aaron Harper
h3. Q1. Why are we making this?
6 6 Aaron Harper
7 1 Aaron Harper
This product is being made on request by a local business, a Wireless Internet Service Provider (WISP) who needs to monitor charge rate, currents, voltages, and temperatures in enclosures to estimate battery life and become informed of issues.  These enclosures are at the top of 13-14,000 foot mountains and up radio towers, so durability and remote diagnostic information are the key.
8 1 Aaron Harper
9 6 Aaron Harper
h3. Q2. Who is this for?
10 1 Aaron Harper
11 1 Aaron Harper
Primary client is a WISP, but the system will also work for HAB and satellite payloads with similar needs.
12 1 Aaron Harper
13 6 Aaron Harper
h3. Q3. How will this be used?
14 1 Aaron Harper
15 1 Aaron Harper
The unit will monitor voltages and currents to determine system health and charge/discharge rates.  This data coupled with ambient temperature sensing will accurately indicate battery life as well as provide diagnostic information before driving hundreds of miles, climbing to the top of a radio tower on the top of a snow covered peak only to find that you need a part which you did not bring with you.
16 1 Aaron Harper
17 6 Aaron Harper
h3. Q4. What features does it need to have (now)?
18 1 Aaron Harper
19 1 Aaron Harper
* Low power consumption
20 1 Aaron Harper
* The ability to measure ambient temperature
21 1 Aaron Harper
* Measure current flow and voltage on two circuits
22 1 Aaron Harper
* Measurement data reported via Ethernet.
23 1 Aaron Harper
24 6 Aaron Harper
h3. Q5. What features does it need to have (later)?
25 1 Aaron Harper
26 1 Aaron Harper
* Local serial communications to enable integration in HAB or satellite bus
27 1 Aaron Harper
* The ability to cut and engage power on local or remote command or by timer
28 1 Aaron Harper
* Power circuits monitored and controlled using remote boards connected by serial bus such as SPI
29 1 Aaron Harper
* Programmable sequenced power up, power down, and low power modes
30 1 Aaron Harper
* Multiple point temperature sensing
31 1 Aaron Harper
* Heater control circuits
32 1 Aaron Harper
* Extra GPIO for further sensing and control
33 1 Aaron Harper
* Simple setup and control by local web page
34 1 Aaron Harper
35 6 Aaron Harper
h3. Q6. What are the legacy requirements?
36 1 Aaron Harper
37 3 Aaron Harper
* System must be able to operate on a lead acid battery at 12 or 24 VDC.  These values represent 15-30 real volts during charging.
38 1 Aaron Harper
* System must be able to measure output of the solar array, which could go as high as 70 volts during an open circuit event.
39 3 Aaron Harper
* System must be able to operate at -40C to report issues in the worst conditions
40 1 Aaron Harper
* System must be able to operate at +80C to report issues in the worst conditions
41 1 Aaron Harper
42 6 Aaron Harper
h3. Q7. Who's going to build this?
43 2 Aaron Harper
44 1 Aaron Harper
The production units for the client will be built in Aaron's lab facility which has a static safe workstation.  As this is an open hardware design, anyone is welcome to build as many as they like. 
45 1 Aaron Harper
46 6 Aaron Harper
h3. Q8. How many do we want to make?
47 1 Aaron Harper
48 1 Aaron Harper
The initial production run is for about 40 units.  As this is an open hardware design, anyone is welcome to build as many as they like. 
49 1 Aaron Harper
50 6 Aaron Harper
h3. Q9. What is the budget?
51 1 Aaron Harper
52 1 Aaron Harper
The price to beat for this system is $2000 per unit.  My design goal is to keep it under $100 cost per unit which will be sold to the client at cost plus labor.
53 1 Aaron Harper
54 6 Aaron Harper
h3. Q10. What is the timeline?
55 1 Aaron Harper
56 1 Aaron Harper
ASAP.  This product was needed by the client before the onset of winter, but he didn't know it this was possible within his budget.  Going to a national WISP conference, he determined that his need was common in the industry.  The development schedule follows:
57 1 Aaron Harper
58 6 Aaron Harper
* Project inception on ODE - 29 JAN @ 1200 *Completed*
59 6 Aaron Harper
* SEP Step 1: Initial Questions - 29 JAN @ 1400 *Completed*
60 6 Aaron Harper
* SEP Step 2: Requirements Document - 29 Jan @ 1600 *Completed*
61 6 Aaron Harper
* SEP Step 3: Block Diagram - 29Jan @ 1900 *Completed*
62 6 Aaron Harper
* SEP Step 4: Preliminary Design - 30 Jan @ 1700 *Completed*
63 6 Aaron Harper
* SEP Step 6: Detailed Design - 31 Jan @ 1700 *Completed, PCB layout scheduled for 25 FEB 2013*
64 6 Aaron Harper
* SEP Step 7a: Design Review (filed) - 01 Feb @ 0800 *Completed*
65 1 Aaron Harper
* SEP Step 7b: Design Review (returned) - 04 Feb @ 1400
66 1 Aaron Harper
* SEP Step 8: Parts ordering - 04 Feb 1500
67 1 Aaron Harper
* SEP Step 9: Assembly - begins 18 Feb @ 0800 or earlier depending on parts availability
68 1 Aaron Harper
* SEP Step 10: Integration - none necessary.  testing and deployment meet this need.
69 1 Aaron Harper
* SEP Step 11: Testing - begins immediately after assembly is complete and continues until delivery or deployment.
70 1 Aaron Harper
* SEP Step 12: Delivery/Deployment - 04 Mar @ 0800
71 1 Aaron Harper
* SEP Step 13: Disposal - Unknown, TBA
72 1 Aaron Harper
73 6 Aaron Harper
h3. Q11. What waste products will be produced by the manufacture and/or operation of this?
74 1 Aaron Harper
75 1 Aaron Harper
Unknown.  All E-waste must be handled in an environmentally responsible manner in compliance with applicable law.