Feature #68
Finish v1 design of mill
Status: | New | Start date: | 07/13/2012 | |
---|---|---|---|---|
Priority: | Normal | Due date: | 07/21/2012 | |
Assignee: | Brandin Watson | % Done: | 0% |
|
Category: | - | Spent time: | - | |
Target version: | - | Estimated time: | 10.00 hours |
Description
We have designed the base, now we need to do at least a preliminary design of the gantry system.
We also need to determine the best system to use as rails for the gantry to move on.