Hardware Setup
Version 1 (Skylar Hoffert, 09/20/2018 04:51 pm)
1 | 1 | Skylar Hoffert | h1. Hardware Setup |
---|---|---|---|
2 | 1 | Skylar Hoffert | |
3 | 1 | Skylar Hoffert | {{>toc}} |
4 | 1 | Skylar Hoffert | |
5 | 1 | Skylar Hoffert | h2. Tools |
6 | 1 | Skylar Hoffert | |
7 | 1 | Skylar Hoffert | None. |
8 | 1 | Skylar Hoffert | |
9 | 1 | Skylar Hoffert | h2. Materials |
10 | 1 | Skylar Hoffert | |
11 | 1 | Skylar Hoffert | * (1) H-01: RTL-SDR Dongle |
12 | 1 | Skylar Hoffert | * (2) H-02: 1/4 Wave Monpole Antenna |
13 | 1 | Skylar Hoffert | * (3) H-03: TRAM NMO 5 1/2'' Magnet NMO Mounting with Rubber Boot |
14 | 1 | Skylar Hoffert | |
15 | 1 | Skylar Hoffert | h2. Safety Issues |
16 | 1 | Skylar Hoffert | |
17 | 1 | Skylar Hoffert | * Be careful of static discharge for the RTL-SDR dongle. |
18 | 1 | Skylar Hoffert | * Antenna is very conductive, be careful of electric shock near high voltage sources. |
19 | 1 | Skylar Hoffert | |
20 | 1 | Skylar Hoffert | h2. Product |
21 | 1 | Skylar Hoffert | |
22 | 1 | Skylar Hoffert | Full Hardware Assembly |
23 | 1 | Skylar Hoffert | |
24 | 1 | Skylar Hoffert | h2. Procedure |
25 | 1 | Skylar Hoffert | |
26 | 1 | Skylar Hoffert | h3. 1. Prepare Mounting Slot |
27 | 1 | Skylar Hoffert | |
28 | 1 | Skylar Hoffert | # Do a test fit (without glue) of the *HSC-03: Controller Housing Base* and *HSC-10: Controller Housing Mounting Slot* by sliding the *Controller Housing Base* into the *Controller Housing Mounting Slot* |
29 | 1 | Skylar Hoffert | !step1.1-sm.jpg! |
30 | 1 | Skylar Hoffert | # Separate the *Controller Housing Base* into the *Controller Housing Mounting Slot* |
31 | 1 | Skylar Hoffert | # Apply super glue to the inner perimeter of the *Controller Housing Mounting Slot* where the *Controller Housing Base* will sit, taking care to keep glue out of the cut out for the slot; apply extra super glue to the large raised surface to ensure a strong bond. See yellow lines in image below. |
32 | 1 | Skylar Hoffert | !step1.3-sm.jpg! |
33 | 1 | Skylar Hoffert | # Slide the *Controller Housing Base* into the *Controller Housing Mounting Slot* and press the pieces together per the glue's instructions (typically 1 minute) |
34 | 1 | Skylar Hoffert | # Allow the glue to cure per its instructions |
35 | 1 | Skylar Hoffert | |
36 | 1 | Skylar Hoffert | h3. 2. Solder Headers to Feather |
37 | 1 | Skylar Hoffert | |
38 | 1 | Skylar Hoffert | *TBD by Bryan* |
39 | 1 | Skylar Hoffert | |
40 | 1 | Skylar Hoffert | h3. 3. Assemble Controller Components |
41 | 1 | Skylar Hoffert | |
42 | 1 | Skylar Hoffert | # Attach *HSC-08: TRRS Wing* to underside headers on *HSC-02: Holoseat Controller Wing* |
43 | 1 | Skylar Hoffert | !step3.1-sm.jpg! |
44 | 1 | Skylar Hoffert | # Attach *TRRS Wing + Controller Wing* to *Feather* |
45 | 1 | Skylar Hoffert | !step3.2-sm.jpg! |
46 | 1 | Skylar Hoffert | # Attach *HSC-09: Keyswitch* to *Controller Wing* (note, the LED on the *Keyswitch* should be on the left side when the *TRRS Wing* is toward you) |
47 | 1 | Skylar Hoffert | !step3.3-sm.jpg! |
48 | 1 | Skylar Hoffert | |
49 | 1 | Skylar Hoffert | h3. 4. Install Firmware and Test Controller |
50 | 1 | Skylar Hoffert | |
51 | 1 | Skylar Hoffert | *TBD by J. when test and firmware code is updated* |
52 | 1 | Skylar Hoffert | |
53 | 1 | Skylar Hoffert | h3. 5. Final Assembly |
54 | 1 | Skylar Hoffert | |
55 | 1 | Skylar Hoffert | # Insert *Feather + Wings* into *HSC-03: Controller Housing Base* |
56 | 1 | Skylar Hoffert | !step5.1-sm.jpg! |
57 | 1 | Skylar Hoffert | # Attach *HSC-04: Controller Housing Top* onto *Controller Housing Base* making sure the snap fit connection fully clicks and the inset over TRRS connector seats fully into the *Controller Housing Base* |
58 | 1 | Skylar Hoffert | !step5.2-sm.jpg! !step5.2b-sm.jpg! |
59 | 1 | Skylar Hoffert | # Attach *HSC-07: Holoseat Custom Key Cap* to *Keyswitch* |
60 | 1 | Skylar Hoffert | !step5.3-sm.jpg! |