Tone Ring Half Assembly

Tools

Materials

Note: The final build requires (2) HS-03: 18 Pole Tone Ring Halves

Safety Issues

Product

HS-03: 18 Pole Tone Ring Half

Procedure

1. Place Heat-Set Insert

  1. Place the 18PTR-01: Snap Fit 18 Pole Tone Ring Base on heat proof mat with the spacer supporting the overhanging tab
    INSERT PIC
  2. Place 18PTR-04: M3 x 0.5 mm Thread Size, 3.8 mm Installed Length Heat-Set Inserts for Plastics face up into the the hole in the Tone Ring Base
    INSERT SCHEMATIC
    INSERT PIC
  3. Set Soldering Iron to 350 Celsius and wait for it to reach temperature
  4. Use the flat of the soldering iron tip to apply gentle pressure to the heat-set insert until it melts into the hole and sits flush. Take care not to twist or shift the insert.
    INSERT VID

2. Place Initial Magnet

  1. South pole (attracts red indicator) facing out)
  2. Glue in place
  3. Wait 15 min

3. Place Remaining Magnets

  1. Select another magnet and find its polarity by placing it along the outside edge so that it becomes attracted to the previous magnet
  2. Rotate the magnet from the previous step 180 degrees (so that the pole attracted to the previous magnet is facing out to create a pole pair) and place it in the next slot in the base
    INSERT PIC
  3. Repeat the previous two steps until the tone ring is fully populated
    INSERT PIC
  4. Align and place the 18PTR-02: Snap Fit Tone Ring Cover over the 18PTR-01: Snap Fit 18 Pole Tone Ring Base
  5. Press the parts firmly to secure the cover to the base
    INSERT PIC

4. Verify Magnet Placement

Note: You will need (2) in progress HS-03: 18 Pole Tone Ring Halves for testing

  1. Set up the Holoseat Test Stand
    1. Ensure the calibrated sensor is attached to the sensor controller
    2. Ensure the power and USB connections are all configured according to the test stand operating instructions
    3. Join (2) in progress HS-03: 18 Pole Tone Ring Halves onto the tone ring adapter
      INSERT PIC
  2. Run tone ring test(s)
    INSERT TEST VID
    INSERT RESULTS PIC
  3. Remove the tone ring halves from the tone ring adapter

5. Fix Cover to Base

  1. Apply super glue to the Base as shown below
    INSERT PIC
  2. Place 18PTR-02: Snap Fit 18 Pole Tone Ring Cover onto Base
  3. Press the Top firmly onto the base for 1 minute
  4. Wait 1 hour

6. Verify Fit

Note: You will need (2) in progress HS-03: 18 Pole Tone Ring Halves which going forward will be considered a complete set

  1. ...

References