Operating Manual

The items below have been gleaned from meeting notes and video obtained during the Far Horizons design meetings and launch.

TODO: These need to be put in the correct order and formed into a proper set of procedures. A format for the procedures needs to be decided on for this page.

Equipment Checklist

ODT (Open Document Text) and PDF versions of this checklist are available.

1.0 Pre-Departure Operations

These are operations that are completed before the launch and chase teams leave for the launch site.

2.0 Setup Operations

These operations cover assembling the flight vehicle and attaching the payload(s).

3.0 Launch Operations

4.0 Chase and Recovery Operations