Documents / Images / Still_Frames / 6-second lift msmt - FH Prelaunch, Setup, Assembly Part 3 SMALL
Revisions
2013-12-29 20:34:11 by Jeremy Wright
6-second lift msmt - FH Prelaunch, Setup, Assembly Part 3 SMALL
Images/Still_Frames/6-second lift msmt - FH Prelaunch, Setup, Assembly Part 3 SMALL.jpg
Second balloon lift measurement to see if the balloon was full enough.
0.1
None
image/jpeg
120.7 kB