Copy

Documents / Images / Still_Frames / 6-second lift msmt - FH Prelaunch, Setup, Assembly Part 3 SMALL

Revisions

Download

2013-12-29 20:34:11 by Jeremy Wright

6-second lift msmt - FH Prelaunch, Setup, Assembly Part 3 SMALL

Images/Still_Frames/6-second lift msmt - FH Prelaunch, Setup, Assembly Part 3 SMALL.jpg

Second balloon lift measurement to see if the balloon was full enough.

0.1

None

image/jpeg 

120.7 kB


(1-1/1) | Per page: 25, 50, 100