Copy

Documents / Images / Still_Frames / 3-weighing the frame- FH Prelaunch Setup Assembly Part 2 SMALL

Revisions

Download

2013-12-29 20:27:01 by Jeremy Wright

3-weighing the frame- FH Prelaunch Setup Assembly Part 2 SMALL

Images/Still_Frames/3-weighing the frame- FH Prelaunch Setup Assembly Part 2 SMALL.jpg

Weighing the individual components that will be attached to the HAB frame to ensure that the individual and total payload weights don't exceed FAA regulations.

0.1

None

image/jpeg 

141.8 kB


(1-1/1) | Per page: 25, 50, 100