Documents / Images / Still_Frames / 3-weighing the frame- FH Prelaunch Setup Assembly Part 2 SMALL
Revisions
2013-12-29 20:27:01 by Jeremy Wright
3-weighing the frame- FH Prelaunch Setup Assembly Part 2 SMALL
Images/Still_Frames/3-weighing the frame- FH Prelaunch Setup Assembly Part 2 SMALL.jpg
Weighing the individual components that will be attached to the HAB frame to ensure that the individual and total payload weights don't exceed FAA regulations.
0.1
None
image/jpeg
141.8 kB