Documents / Images / Still_Frames / 2-pulling down on scale to measure lift - FH Prelaunch Setup and Assembly Part 3 SMALL
Revisions
2013-12-29 20:21:46 by Jeremy Wright
2-pulling down on scale to measure lift - FH Prelaunch Setup and Assembly Part 3 SMALL
Images/Still_Frames/2-pulling down on scale to measure lift - FH Prelaunch Setup and Assembly Part 3 SMALL.jpg
Pulling down of the fish scale attached to the balloon so that the lift can be measured.
0.1
None
image/jpeg
128.7 kB